Skip to main content

Three bridges to be replaced in Nuremburg

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.
July 22, 2014 Read time: 1 min

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.

Related Content

  • Costa Rica road widening work planned
    October 1, 2019
    Road widening work is being planned on the route connecting Costa Rican capital San Jose with nearby Cartago. The work is intended to cut congestion on the route, which suffers from delays at peak periods. In all the project is expected to cost US$400 million. The work is being carried out by local contractor Meco, which is now starting with a feasibility study and drawing up preliminary plans. The route will be tolled but the Costa Rican Government says it will ensure that the tolls are kept to a low level
  • Nigeria-Ivory Coast highway being planned
    February 11, 2019
    A feasibility study is to be carried out for the planned highway connecting Nigeria’s commercial centre Lagos with Ivory Coast capital Abidjan.
  • VIDEO: Successful explosive bridge demolition in Kentucky
    July 28, 2016
    A successful explosive bridge demolition job has been carried out in the US State of Kentucky. After a short delay, demolition specialists managed to remove the old Eggners Ferry Bridge successfully and without incident. The explosives broke up the four middle spans of the structure. The demolition job was not without its challenges, with concern over the presence of nesting ospreys on the structure. Demolition personnel had to keep a distance of 90m from the nesting area, which delayed preparations.
  • Flatiron and Dragados win Corpus Christi Bridge deal
    June 25, 2015
    The Texas Transportation Commission has conditionally awarded the two companies, Flatiron and Dragados the contract to design, build and operate a new cable stayed Corpus Christi Harbor Bridge.