Skip to main content

A thousand birthday greetings for US-Canada Thousand Island Bridge

The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
August 21, 2018 Read time: 2 mins
The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters.


The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montreal and Toronto, ending in Windsor on the Ontario border with the US state of Michigan.

The 1,370m crossing over the American channel of the river - from the US mainland to Wellesley Island - consists of a suspension bridge with a main span of around 245m and nearly 46m of clearance above the river.

The Canadian crossing includes the 183m continuous Warren Truss span connecting Hill Island to Constance Island, a steel arch of 106m spans from Constance Island to Georgina Island and a suspension bridge of 229m from Georgina Island to the Canadian mainland. The Canadian span from abutment to abutment is 1,015m and the suspension span provides 37m of river clearance.

The boundary at the International Rift boundary – the channel between Wellesley Island and Hill Island - is bridged by two parallel 27.4m rigid-frame arched spans of reinforced concrete with masonry facing. Originally there was only one bridge at boundary but due to increased traffic it was twinned in 1959.

Operation of the Thousand Islands Bridge system is shared under a joint agreement that created the US based Thousand Islands Bridge Authority which estimates that there are 2,000 vehicle-cross the annually. The system’s original consulting engineer was Robinson and Steinman of New York City that  continues to do so today but as 3220 Parsons Transportation, notes the authority.

For more information on companies in this article

Related Content

  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • New funding for 44 infrastructure projects
    December 26, 2024
    New funding awards escalate the launch of 44 major infrastructure projects.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Pennsylvania Turnpike celebrating 80th anniversary
    March 20, 2020
    The Pennsylvania Turnpike will celebrate its 80th anniversary during 2020.