Skip to main content

Third phase for Colombia’s complex PPP project

Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present.
September 15, 2017 Read time: 1 min

Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present. The tunnel sections driven to date include the 4.5km Buenavista II section and the 200m Bijagual II tunnel. Meanwhile three of the bridges should be complete by the end of this year. Coviandina is itself part of the Colombian financial services company Grupo Aval.

Related Content

  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Colombia: more money for Toyo Tunnel Project
    April 4, 2024
    The Toyo Tunnel Project – the Guillermo Gaviria Echeverri Tunnel Project - covers 18.3km including new roads and is under construction by Consorcio Antioquia al Mar.
  • Davao City tunnel work accelerated
    November 18, 2022
    The twin-tube 2.3km-long tunnel will be the longest in the Philippines and is being constructed by Filipino and Japanese engineers.
  • Land acquisition delays the start of Bratislava's orbital road
    September 25, 2017
    Land acquisition issues have stalled the start of construction of Bratislava’s orbital road by up to eight months. Work could begin this autumn, according to a report by the Slovak Spectator, because the government is working on laws that would allow construction before all land is acquired.