Skip to main content

Thailand ring road project to be rerouted?

Calls have been made for the route of Thailand's third western ring road to be changed. Locals in Ayutthaya, Samut Sakhon, Pathum Thani, Nakhon Pathom and Nonthaburi provinces are petitioning for the project to be diverted. The ring road will be largely elevated and stretch 98km in all. An analysis of the route and the possibility for changes is to be carried out. When complete, the new link will connect Rama II and Ayutthaya.
April 2, 2019 Read time: 1 min

Calls have been made for the route of Thailand's third western ring road to be changed. Locals in Ayutthaya, Samut Sakhon, Pathum Thani, Nakhon Pathom and Nonthaburi provinces are petitioning for the project to be diverted. The ring road will be largely elevated and stretch 98km in all. An analysis of the route and the possibility for changes is to be carried out. When complete, the new link will connect Rama II and Ayutthaya.

Related Content

  • China's latest links
    February 16, 2012
    Work is commencing on a key a bridge link in China. The new bridge will be located in Shandong's Dongming County and will take four years to construct.
  • Indonesian infrastructure repairs benefit from Japan input
    February 10, 2020
    A Japanese loan will help with Indonesian road repairs.
  • Auckland’s causeway project
    April 4, 2014
    When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.
  • Colombia tunnel construction contract commencing
    February 5, 2018
    Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.