Skip to main content

Texas toll road opening in 2018

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers.
December 15, 2017 Read time: 1 min

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers. The project has been managed by the 2363 North Texas Tollway Authority. When the link opens to traffic it is expected to carry around 55,000 vehicles/day but this is expected to rise to 174,000 vehicles/day by 2030 due to growth in the area.

For more information on companies in this article

Related Content

  • New US$534 million tollway for Illinois
    December 2, 2024
    A new US$534 million tollway for Illinois will link to O’Hare International Airport.
  • China’s undersea tunnel project is being planned
    August 20, 2018
    Plans are being drawn up for the project to drive a new undersea tunnel in Southern China to improve transport links between Shenzhen and Guangzhou. The tunnel itself will be around 1.1km long but the project will also include building a 4.45km stretch of road in the Dachan Bay area and a 2.5km stretch of road in Qianhai.
  • South Africa roads upgrade planned
    March 1, 2019
    Major road improvements will be carried out in several South African provinces. The Transport ministry has set a budget of US$880 million to improve key road links. Some of the projects being handled by the state-owned road company, SANRAL, are commencing shortly and should be completed in the next 12-24 months. One link being improved is the RS573 Moloto Road, which has an unenviable reputation for its frequent crashes. A budget of $217 million has been set for the work, which will include widening secti
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of