Skip to main content

Texas toll road opening in 2018

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers.
December 15, 2017 Read time: 1 min

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers. The project has been managed by the 2363 North Texas Tollway Authority. When the link opens to traffic it is expected to carry around 55,000 vehicles/day but this is expected to rise to 174,000 vehicles/day by 2030 due to growth in the area.

For more information on companies in this article

Related Content

  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Qatar’s new highway requires huge logistics operation
    October 26, 2016
    In the Middle East nation Qatar, a large-scale highway project is underway that will make significant improvements for vehicle capacity and cut journey times for drivers. The new route will also improve transport connections between Qatar’s ports and neighbouring Saudi Arabia. At the same time, the new highway will carry much of the heavy vehicle traffic travelling between the two countries.
  • Brisbane’s Legacy Way Tunnel is open to traffic
    June 4, 2015
    An official opening has been carried out for Australia’s Legacy Way Tunnel. The 4.6km route located in Brisbane, Queensland is open to traffic. The construction project was handled by Transcity, formed by Spanish contractor firm Acciona along with BMD Constructions and Ghella. This is the first major project in Australia with which Acciona has been directly involved. The project was awarded in 2010 and cost in the region of US$1.64 billion to construct. It was originally due for completion in late 2014. The
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e