Skip to main content

Tender evaluation nears for Croatia’s Peljeski Bridge Project

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
September 22, 2017 Read time: 2 mins

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media.

Bids for construction of the four-lane 2.4km long bridge have been submitted by the 3366 China Road and Bridge Corporation, Austria's 945 Strabag as well as consortia headed by Italy’s 1324 Astaldi and the Turkish company Ictas.

The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory.

While the bridge will be good for the economy of the Croatian area, Bosnia and Herzegovina has in the past requested that Croatia pause procurement for the project pending discussions between the two countries over the design.

Bosnia’s concern is that the largest ocean-going ships should have access up Ston Bay to Bosnia’s only sea port, Neum, should the Bosnian government decide to upgrade the terminals there.

Discussions have resulted in Croatia accepting design changes – and added costs - suggested by Bosnia, including an increase of bridge's height from 35m to 55m and spacing bridge supports at least 200m apart.

In June, the 2465 European Commission approved €357 million of the European Union’s Cohesion Policy funds to build the bridge – around 85% of the project’s cost. The European Union is also funding supporting infrastructure, such as the construction of access roads, including tunnels, bridges and viaducts, the building of an 8km-long bypass near the town of Ston and upgrading works on the existing road D414. Project completion is set for 20122.

Croatia's prime minister, Andrej Plenkovic, has consistently said that the project will not jeopardise the interests of Bosnia.

For more information on companies in this article

Related Content

  • Cengiz wins Corridor VC contract in Bosnia
    March 21, 2023
    Cengiz submitted the lowest bid in the tender which attracted three offers in the deal said to be worth around €361.8 million, according to Bosnia’s state highways agency Autoceste.
  • EC approves Croatia’s Istarski Ipsilon – Istsrian Y - expansion
    June 22, 2018
    The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network. The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula. The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.
  • Croatia-Bosnia connection
    October 2, 2018
    The Svilaj Bridge connecting Croatia and the Federation of Bosnia and Herzegovina is nearly 40% complete, according to the contractors and the Croatian Motorways Directorate. Locally, the Svilaj Bridge – financially a 50-50 project between the two countries - is part of a motorway running from Beli Manastir to Osijek and on tyo Svilaj. But the route is also part of the motorway Budapest-Osijek-Sarajevo-Plocˇ which is the Pan European Corridor Vc (Corridor 5, branch c) connecting Budapest with the Adriatic.
  • Croatia opens 17.5km section of Corridor 5c
    December 14, 2022
    The majority of the 5c, or Vc, route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD)