Skip to main content

Tender evaluation nears for Croatia’s Peljeski Bridge Project

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
September 22, 2017 Read time: 2 mins

Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media.

Bids for construction of the four-lane 2.4km long bridge have been submitted by the 3366 China Road and Bridge Corporation, Austria's 945 Strabag as well as consortia headed by Italy’s 1324 Astaldi and the Turkish company Ictas.

The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory.

While the bridge will be good for the economy of the Croatian area, Bosnia and Herzegovina has in the past requested that Croatia pause procurement for the project pending discussions between the two countries over the design.

Bosnia’s concern is that the largest ocean-going ships should have access up Ston Bay to Bosnia’s only sea port, Neum, should the Bosnian government decide to upgrade the terminals there.

Discussions have resulted in Croatia accepting design changes – and added costs - suggested by Bosnia, including an increase of bridge's height from 35m to 55m and spacing bridge supports at least 200m apart.

In June, the 2465 European Commission approved €357 million of the European Union’s Cohesion Policy funds to build the bridge – around 85% of the project’s cost. The European Union is also funding supporting infrastructure, such as the construction of access roads, including tunnels, bridges and viaducts, the building of an 8km-long bypass near the town of Ston and upgrading works on the existing road D414. Project completion is set for 20122.

Croatia's prime minister, Andrej Plenkovic, has consistently said that the project will not jeopardise the interests of Bosnia.

For more information on companies in this article

Related Content

  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
  • Doboj headed for a 5C bypass
    November 2, 2020
    The 53km bypass is part of upgrading for the European route Corridor 5C.
  • Concerns over bidding for Pocitelj Bridge work surface in Bosnia
    January 12, 2017
    A Bosnian minister has expressed concern over the difference between bids by two consortia for a motorway project that includes construction of the Pocitelj Bridge. Bosnia's state-owned motorway company Autoceste FBiH said in May that it had signed a contract worth nearly €108 million with the joint venture of Euroasfalt and Strabag for construction of the 5.8km Klopce-Donja Gracanica subsection of pan-European transport Corridor Vc. A report by the Bosnian news agency Fena said that Bosnia's deputy m
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas