Skip to main content

Tees Valley crossing project consultation nears an end

Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an
May 9, 2019 Read time: 2 mins
Artist’s impression of the New Tees Crossing Tees Viaduct Capacity Enhancement option

Public consultation is nearly closed for a possible %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external new crossing across the River Tees false https://teesvalley-ca.gov.uk/transport/new-tees-crossing-consultation/ false false%> in northern England that could cost upwards of €350 million.

A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government.

Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound and the existing structure widened to allow for an extra lane of southbound traffic.

The Tees Viaduct option would be to construct a four-lane bridge parallel to the existing A19 viaduct to handle both north and southbound traffic.

The chosen option will be announced in autumn with confirmation of central government funding soon after. Construction is set for 2023-27.

The Tees Valley Combined Authority was created in April 2016, combining Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. In 2017, residents elected a mayor whose responsibilities include transport, business growth and investment.

The existing 2.9km-long viaduct, opened in 1975, is a girder bridge with reinforced concrete piers and pier bends supporting steel-plate girder beams and a composite deck with around 200 moving parts. Distance between the abutments is 1.95km and none of the piers are in the river. It has 68 spans on the main north south route, with the largest span, 117m, being over the river.

In 1989 work finished on enclosing the underside of the bridge with steel and glass-reinforced plastic panelling to protect the primary structure from weathering and to allow safer and more easy maintenance.

Related Content

  • High performance skid steer loaders offered by LiuGong
    February 8, 2013
    LiuGong is revamping its skid steer loader line with the launch of its new 375B model. This productive machine offers a capacity of 865kg and features a radial lift configuration. A key feature is its new structural steel cab, which offers a wider view of the working area. The company claims that this machine is durable and reliable, as well as being highly productive. New features include two-speed travel, double-lever pilot control and a spacious low-noise, low-vibration cab, which is fully ROPS/FOPS cert
  • NLMK Clabecq introduces latest special steels at INTERMAT 2012
    January 6, 2017
    New options in the Quard and Quend ranges from Belgium-based specialist in hot-rolled steel plate producer NLMK Clabecq will be introduced at INTERMAT.
  • NLMK Clabecq introduces latest special steels at INTERMAT 2012
    February 6, 2012
    New options in the Quard and Quend ranges from Belgium-based specialist in hot-rolled steel plate producer NLMK Clabecq will be introduced at INTERMAT.
  • Michelin premium radial and hard surface tyres for backhoes
    March 11, 2014
    Michelin has launched two additional tyres for backhoe loaders and telescopic handlers. The Power CL, which will go on sale in July this year, is a premium bias ply tyre that can handle the same load capacity as a radial, but at a lower cost. Michelin will have a full size offering for this tyre by the end of the year. Also available is the BibLoad Hard Surface radial that has steel belts and reinforced casings for added sidewall protection. With a non-directional tread pattern the BibLoad tyre is designed