Skip to main content

Tees Valley crossing project consultation nears an end

Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an
May 9, 2019 Read time: 2 mins
Artist’s impression of the New Tees Crossing Tees Viaduct Capacity Enhancement option

Public consultation is nearly closed for a possible %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external new crossing across the River Tees false https://teesvalley-ca.gov.uk/transport/new-tees-crossing-consultation/ false false%> in northern England that could cost upwards of €350 million.

A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government.

Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound and the existing structure widened to allow for an extra lane of southbound traffic.

The Tees Viaduct option would be to construct a four-lane bridge parallel to the existing A19 viaduct to handle both north and southbound traffic.

The chosen option will be announced in autumn with confirmation of central government funding soon after. Construction is set for 2023-27.

The Tees Valley Combined Authority was created in April 2016, combining Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. In 2017, residents elected a mayor whose responsibilities include transport, business growth and investment.

The existing 2.9km-long viaduct, opened in 1975, is a girder bridge with reinforced concrete piers and pier bends supporting steel-plate girder beams and a composite deck with around 200 moving parts. Distance between the abutments is 1.95km and none of the piers are in the river. It has 68 spans on the main north south route, with the largest span, 117m, being over the river.

In 1989 work finished on enclosing the underside of the bridge with steel and glass-reinforced plastic panelling to protect the primary structure from weathering and to allow safer and more easy maintenance.

Related Content

  • Sandvik DC125R is new member of DC hammer drill family
    February 13, 2013
    Sandvik DC125R is a new member to the proven Sandvik DC family of compact, rubber-tyred top hammer drill rigs. The fully remote-controlled, hydraulic and self-propelled mini-sized drilling unit on a four-wheel drive carrier, is for drilling 22–45mm holes, and replaces the former Sandvik DC122R, one in the series of rigs originally launched in 1988 under the product name of Tamrock Commando. “A range of job site tests show that the new model offers better manoeuvrability than ever before. This is thanks to t
  • Kleemann showcases Mobicat MC 100 R jaw crusher
    January 6, 2017
    Kleemann will showcase the Mobicat MC 100 R mobile jaw crusher from its successful Contractor Line. Weighing approximately 36tonnes it is relatively easy to transport and thus also ideal for smaller jobs, and there is the option to lower the crushing unit hydraulically to a height of 3,200mm for transport purposes. The powerful diesel engine with 228kW, together with the hydraulic crusher drive, ensures maximum feed capacity of up to 200 tonnes/hour, says Kleemann. The MC 100 R has sufficient power reserve
  • Kleemann showcases Mobicat MC 100 R jaw crusher
    April 12, 2012
    Kleemann will showcase the Mobicat MC 100 R mobile jaw crusher from its successful Contractor Line. Weighing approximately 36tonnes it is relatively easy to transport and thus also ideal for smaller jobs, and there is the option to lower the crushing unit hydraulically to a height of 3,200mm for transport purposes. The powerful diesel engine with 228kW, together with the hydraulic crusher drive, ensures maximum feed capacity of up to 200 tonnes/hour, says Kleemann. The MC 100 R has sufficient power reserve
  • High performance skid steer loaders offered by LiuGong
    January 6, 2017
    LiuGong is revamping its skid steer loader line with the launch of its new 375B model. This productive machine offers a capacity of 865kg and features a radial lift configuration. A key feature is its new structural steel cab, which offers a wider view of the working area. The company claims that this machine is durable and reliable, as well as being highly productive. New features include two-speed travel, double-lever pilot control and a spacious low-noise, low-vibration cab, which is fully ROPS/FOPS cert