Skip to main content

Successful explosive demolition of old bridge in US state of Missouri

A successful explosive demolition has been carried out of the Hurricane Deck Bridge in the US state of Missouri. The Hurricane Deck Bridge carried Missouri Route 5 over Lake of the Ozarks and measured 695m long. The structure was no longer able to cope with the traffic volumes it was carrying and the Missouri Department of Transport (MODOT) opted to build a new delta frame bridge to replace it. Work started on the new bridge in 2012 and this was opened to traffic in September 2013. The steel span Hurricane
December 16, 2013 Read time: 2 mins
A successful explosive demolition has been carried out of the Hurricane Deck Bridge in the US state of Missouri. The Hurricane Deck Bridge carried Missouri Route 5 over Lake of the Ozarks and measured 695m long. The structure was no longer able to cope with the traffic volumes it was carrying and the 2699 Missouri Department of Transportation (MODOT) opted to build a new delta frame bridge to replace it. Work started on the new bridge in 2012 and this was opened to traffic in September 2013. The steel span Hurricane Deck Bridge opened to traffic originally in 1936, with work having started in 1934. At the time of its completion it won an award from the American Institute of Steel Construction as the most beautiful steel structure built in the US in 1936. The Hurricane Deck Bridge featured a similar design to that of the I-35W Bridge in Minnesota, which collapsed causing fatalities in 2007. Although the Hurricane Deck Bridge was designed with a longer central span it carried markedly less traffic than the I-35W Bridge however and did not suffer the same structural issues. It derived its name from the upper deck of a river vessel.

Read more on the new structure %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal here Visit: www.modot.org/central./major_projects/camden.htm false http://www.modot.org/central./major_projects/camden.htm false false%>

For more information on companies in this article

Related Content

  • LIVE, from Leipzig, Germany: the ITF 2015 Annual Summit
    May 26, 2015
    If you couldn’t make it to Germany this year for the International Transport Forum’s Annual Summit, you can watch the live webcasts on the ITF website starting today. From this morning, Wednesday, at 11:00 Central European Time, the live webcast of the event will be available directly at this link: http://2015.internationaltransportforum.org/
  • Armenia’s road safety problem is critical
    March 9, 2018
    Armenia is facing a crisis in road safety, according to the World Health Organisation (WHO). The rate of road traffic fatalities in Armenia is 18.3/100,000 population according to the WHO 2015 Global Status Report on Road Safety. This is the highest rate in any Eastern European or Caucasus country, and costs an estimated 4.62% of GDP/year. Establishing partnerships with local authorities is a vital step towards improving road safety, saving lives and developing the economy. EASST partner Poghos Shahinyan,
  • Smoother quieter excavators from Doosan unveiled at INTERMAT
    January 6, 2017
    Doosan’s new Stage IIIB-compliant DX300LC-3 and DX340LC-3 crawler excavators are said to offer 6% to 17% higher productivity, along with fuel saving and reduced costs. The 30 and 35tonne machines have a new ROPS and OPG-certified pressurised cab. A heated air suspension seat and a new cab suspension cut vibration by 20% and reduce the sound level in the cab to 71d(B)A.
  • Smoother quieter excavators from Doosan unveiled at INTERMAT
    April 19, 2012
    Doosan’s new Stage IIIB-compliant DX300LC-3 and DX340LC-3 crawler excavators are said to offer 6% to 17% higher productivity, along with fuel saving and reduced costs. The 30 and 35tonne machines have a new ROPS and OPG-certified pressurised cab. A heated air suspension seat and a new cab suspension cut vibration by 20% and reduce the sound level in the cab to 71d(B)A.