Skip to main content

Strong interest in building new Chile-Argentina tunnel link

Interest is strong in the proposed tunnel linking Chile and Argentina. Some 37 companies have shown expressions of interest in the US$1 billion Agua Negra road tunnel. This includes 22 consortia and includes Latin American firms such as Panedile, Techint, Camargo Correa, Jose Cartellone. It also includes the Chinese firms China Railway Construction Corporation, China Railway Bureau Group, China State Construction Engineering Corporation and Sinohydro Group. Daewoo, Hyundai Engineering and SK Eng & Construct
October 30, 2013 Read time: 2 mins
Interest is strong in the proposed tunnel linking Chile and Argentina. Some 37 companies have shown expressions of interest in the US$1 billion Agua Negra road tunnel. This includes 22 consortia and includes Latin American firms such as 2429 Panedile, Techint, Camargo Correa, 1390 Jose Cartellone. It also includes the Chinese firms 6590 China Railway Construction Corporation, 890 China Railway Bureau Group, 5711 China State Construction Engineering Corporation and 5544 Sinohydro Group. 3086 Daewoo, 5739 Hyundai Engineering and SK Eng & Construction from South Korea are also interested in the project. A bi-lateral body, Ebitan, is administering the applications, which have come from firms in Brazil, China, Italy and Korea, as well as local companies in Argentina and Chile according to Business News Americas. A list of prequalified companies is being released while the tender process is set to open in early 2014. The link will feature twin tunnels nearly 14km long connecting Argentina's San Juan province with Chile's Coquimbo region (region IV). The tunnel is of enormous economic importance to both Argentina and Chile and will help transport and trade between the two countries. The new tunnel will be able to carry traffic that presently has to use either another tunnel, or a dangerous mountain pass that is often closed in poor weather and is not suitable for heavy vehicles. As well as the twin tube tunnel itself, the project also includes upgrades to some 50km of roads in Region IV that will lead to the portal. Work will also be required to improve an airport in Region IV and improve routes 41, 43 and 45 in the region. Construction of the Agua Negra tunnel will be challenging however as both portals are at altitude, which poses severe limitations on the performance of both personnel and equipment. Winter weather conditions can be tough and access to the portal areas can be tricky in poor weather, which will further add to the challenges the construction team will face.

Related Content

  • Sealing the world's longest tunnel
    May 8, 2012
    Infrastructure construction in China is booming as never before, but sealing the world’s longest immersed tunnel is a technically complex engineering project. The impressive Hong Kong-Zhuhai-Macau fixed link project in China includes an immersed tunnel with a record-breaking length of almost 7km. In 2009 construction began on a project to link the island of Hong Kong with Macau and the mainland Chinese city of Zhuhai. The link will be one of the region’s most technically complex engineering projects ever. I
  • Sealing the world's longest tunnel
    March 21, 2012
    Infrastructure construction in China is booming as never before, but sealing the world’s longest immersed tunnel is a technically complex engineering project. The impressive Hong Kong-Zhuhai-Macau fixed link project in China includes an immersed tunnel with a record-breaking length of almost 7km. In 2009 construction began on a project to link the island of Hong Kong with Macau and the mainland Chinese city of Zhuhai. The link will be one of the region’s most technically complex engineering projects ever.
  • Chile’s Chacao Bridge project - futuresecured
    July 19, 2018
    Chile’s landmark Chacao Bridge project now looks to be back on a sound footing, with completion expected in late 2022 or early 2023. This projects for the 2.6km-long bridge was to have been built jointly by Brazilian firm OAS and South Korean company Hyundai. However OAS hit financial difficulties and had to withdraw from the project. As a result, Hyundai will now buy the 49% stake OAS had in the project. As Hyundai already has a 51% stake in the bridge project, this will give the firm total ownership ove
  • FCC heads group that will build Toyo Tunnel in Colombia
    November 6, 2015
    Spanish environmental services, infrastructure and water group FCC has secured a €392 deal to design, build, operate and maintain the 10km Toyo Tunnel in Urabá Port, Colombia. The Government of Antioquia awarded the project to the consortium in which Madrid-based FCC has a 40% share and a group of local business people hold 60%. The tunnel is around 80km from Medellin, the capital of Colombia’s mountainous Antioquia province. The US$426 million contract is for 10 years, during which design and constru