Skip to main content

STRABAG building two more Polish routes

Contractor STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as
January 12, 2018 Read time: 1 min

Contractor 945 STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as lighting and drainage systems.

For more information on companies in this article

Related Content

  • Contracts awarded for key sections of Poland’s S7 route
    June 18, 2015
    Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
  • Consortium signs contract for section of S5 expressway in Poland
    August 8, 2014
    A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company Strabag) and Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra