Skip to main content

STRABAG building two more Polish routes

Contractor STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as
January 12, 2018 Read time: 1 min

Contractor 945 STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as lighting and drainage systems.

For more information on companies in this article

Related Content

  • Czech highway deal for consortium partners
    February 5, 2019
    A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern
  • Strabag and GBS-Infrastructure to build Sofia-Kalotina motorway
    August 2, 2018
    Austrian construction firm Strabag and Bulgarian firm GBS-Infrastructure Construction have won the contract to build the 32.4 km Sofia-Kalotina motorway. Cost of the 32.4kmn four-lane project is estimated at €120 million with completion set for 2020. The Kalotina motorway will run from the capital Sofia’s ring road to the border town of Kalotina where it will connect with Serbia’s A4 motorway. It is also part of 6,100km 10-country European route E80 running from the Portuguese capital Lisbon to the
  • Polish project plan
    February 28, 2012
    The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project.
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan