Skip to main content

Staffordshire road improvements planned

Staffordshire road improvements will commence shortly.
By MJ Woof July 29, 2024 Read time: 2 mins
Road works are planned at Branston in Staffordshire


A scheme bringing major improvements to a key Staffordshire junction in the UK is progressing on schedule, with the latest traffic management changes set to take place shortly.

The multi-million-pound project will ease congestion and increase capacity around the Branston Interchange A38 junction. It includes creating additional lanes around the junction, on the slip roads and on Branston Road and Parkway. New traffic signals will also be installed.

The next phase of the scheme will see overnight works taking place from Tuesday July 30th. These include works to remove the temporary safety barrier on the A38 northbound off slip road, which involves a crane followed by road surfacing works on the northbound off slip road and Branston Road. Later they will include works to then reinstall the temporary safety barrier on the north bound on slip road. During these works, the northbound off slip, northbound on slip road and Branston Road will be closed overnight from 8pm to 6am with signed diversions in place.

A £6 million allocation from UK Government funding and a significant contribution from the main developer of the Branston Locks site, Nurton Developments, are funding the scheme. Work is set to be completed in spring 2025. In addition to improving traffic flow around the junction, the project provides key transport infrastructure for ongoing development at Branston Locks and Burton’s future economic growth.

Staffordshire County Council’s cabinet member for strategic highways Mark Deaville said: “This project is delivering significant improvements to what is a busy junction and one of the main transport gateways to Burton. “Not only will it improve traffic flow around the junction but support Burton and Staffordshire’s economic growth. “We understand there will be some disruption while traffic management is in place, for which we’d like to apologise for, but it is necessary to enable us to move forward in bringing future growth and prosperity to Burton and Staffordshire.”

The county council recently upgraded Burton’s northern A38 junction at Claymills and is making further improvements along the northern gateway route this year together with improvements on the east-west A511 to ensure all other routes into the town are accessible during the Branston works.
 

Related Content

  • Bridge replacement funding approved
    May 10, 2012
    The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009. Local Transport Minister Norman Baker said that the Department for Transport will provide £11.17 million (e13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria. The council’s Cabinet last month approved Birse Civils, part of the Balfour Beatty Group, as the preferred contractor to build the new bridge.
  • All roads lead to Dubrovnik: Corridors for Shared Prosperity
    December 13, 2018
    The European Union Road Federation is organising, in cooperation with the International Road Federation (IRF), the Croatian Roads Company (Hrvatske Ceste), the Croatian Road Association (Via Vita) and the University of Zagreb, the European Road Conference under the theme Corridors for Shared Prosperity in the iconic city of Dubrovnik, from 22 to 24 October 2018 Due to its privileged geographical position, Croatia represents a key crossroads in the connectivity of the South East Europe region, securing a
  • Swindon, UK A419 solar panels to double-up as noise barriers
    August 1, 2013
    A popular road near in the UK county of Wiltshire may be soundproofed using solar panels which double-up as noise barriers. Swindon Borough Council leaders are creating a working group to explore the idea of installing the panels along the A419 dual carriageway near Swindon. The electricity generated is set to fund the scheme, possibly the first of its kind in Britain and targeted for completion within two years. Parts of the A419 already have standard noise barriers, with solar panels expected to cost €1.1
  • Webuild sees double-digit growth in H1
    July 28, 2025
    Construction group's growth 'greater than expected' with revenues up 22%