Skip to main content

Staffordshire road improvements planned

Staffordshire road improvements will commence shortly.
By MJ Woof July 29, 2024 Read time: 2 mins
Road works are planned at Branston in Staffordshire


A scheme bringing major improvements to a key Staffordshire junction in the UK is progressing on schedule, with the latest traffic management changes set to take place shortly.

The multi-million-pound project will ease congestion and increase capacity around the Branston Interchange A38 junction. It includes creating additional lanes around the junction, on the slip roads and on Branston Road and Parkway. New traffic signals will also be installed.

The next phase of the scheme will see overnight works taking place from Tuesday July 30th. These include works to remove the temporary safety barrier on the A38 northbound off slip road, which involves a crane followed by road surfacing works on the northbound off slip road and Branston Road. Later they will include works to then reinstall the temporary safety barrier on the north bound on slip road. During these works, the northbound off slip, northbound on slip road and Branston Road will be closed overnight from 8pm to 6am with signed diversions in place.

A £6 million allocation from UK Government funding and a significant contribution from the main developer of the Branston Locks site, Nurton Developments, are funding the scheme. Work is set to be completed in spring 2025. In addition to improving traffic flow around the junction, the project provides key transport infrastructure for ongoing development at Branston Locks and Burton’s future economic growth.

Staffordshire County Council’s cabinet member for strategic highways Mark Deaville said: “This project is delivering significant improvements to what is a busy junction and one of the main transport gateways to Burton. “Not only will it improve traffic flow around the junction but support Burton and Staffordshire’s economic growth. “We understand there will be some disruption while traffic management is in place, for which we’d like to apologise for, but it is necessary to enable us to move forward in bringing future growth and prosperity to Burton and Staffordshire.”

The county council recently upgraded Burton’s northern A38 junction at Claymills and is making further improvements along the northern gateway route this year together with improvements on the east-west A511 to ensure all other routes into the town are accessible during the Branston works.
 

Related Content

  • The new agile world of the construction equipment industry
    June 22, 2015
    while worldwide for 2015 a crystalball would be helpful, in Europe the sector has already listed specific priorities it wants to tackle, and among these are the upcoming emissions regulations (see separate story), external trade and access to foreign markets, and market surveillance.
  • More tenders for the Lower Thames Crossing
    April 2, 2021
    The winners will build 23km of road connecting to what will be the UK’s longest road tunnel.
  • Appointment made for key London Gateway link works
    November 27, 2012
    J. Murphy & Sons Ltd has been appointed by DP World to deliver junction improvement works on the A13/A1014 interchange road - a critical link into the London Gateway site in south east England. The London Gateway project near Stanford-le-Hope in Essex will comprise a deep water container port, Europe’s largest Logistics Park and a new access road linking the park to The Manorway (A1014) at Sorrel’s Roundabout.
  • Another US$94.08mn for repairs to Hammersmith flyover in London
    June 14, 2013
    A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.