Skip to main content

South Carolina highway deal for Michael Baker International

Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County. The section of I-20 is a main artery into and
June 21, 2016 Read time: 2 mins
Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County.

The section of I-20 is a main artery into and out of Columbia and currently experiences heavy congestion at peak periods. When the project is complete, the stretch of I-20 will be expanded from four to six lanes in each direction. The new section of highway will better accommodate traffic patterns flowing into the city and potentially reduce the daily rush hour commute by nearly 50 percent.

Michael Baker’s Construction Engineering & Inspection team, led by project engineer Tim Sewell, will oversee contract management, inspection and testing services, and verification surveys. Given the roadway’s significance to local commuters, Michael Baker will also assist SCDOT in keeping residents, local businesses and other key regional stakeholders informed of the roadway project’s progress and anticipated lane restrictions or delays, particularly during the construction phase to ensure minimal disruptions. This might include the establishment of a variety of channels, including signage and informational meetings with the public.

The design and engineering phase of the project is expected to begin in the summer of 2016. The roadway project is expected to be complete by the third quarter of 2018.

Related Content

  • Virginia I-95 highway section opening
    August 22, 2023
    A Virginia I-95 highway stretch is opening.
  • TransCore wins White Plains adaptive signal control system contract
    April 26, 2012
    TransCore wins White Plains adaptive signal control system contract. The city of White Plains in New York is deploying a new SCATS-based adaptive traffic signal control system from TransCore that will collect real-time information and then adjust signal timing parameters on a cycle-by-cycle basis on one of the city's major arterials.
  • IRD wins $5 million Oklahoma contract
    April 26, 2012
    International Road Dynamics (IRD) has been awarded a contract by Oklahoma Department of Transportation (ODOT) to build, implement, and maintain new and innovative port-of-entry (POE) electronic (E)-screening systems (EES) and virtual weigh stations (VWS) for commercial vehicles within the State of Oklahoma. The initial phase of the contract includes installations valued at US$5,036,500.00 on Interstate-35 North, Interstate-40 East, and Interstate-40 West. The initial contract period is one year with options
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi