Skip to main content

Slovakia project is on schedule

Slovakia's Ministry of Transport, Construction and Regional Development, has reported that construction of the 12.28km long D3 highway stretch is on schedule. The section runs between Svrcinovec and Skalite and could be opened to traffic at the end of 2016. The stretch is one of the most difficult ones in terms of construction and includes an 84m tall bridge. This stretch of the highway will connect to the section between Skalite and the Polish border. The project is worth nearly €330 million.
March 14, 2016 Read time: 1 min
Slovakia's Ministry of Transport, Construction and Regional Development, has reported that construction of the 12.28km long D3 highway stretch is on schedule. The section runs between Svrcinovec and Skalite and could be opened to traffic at the end of 2016. The stretch is one of the most difficult ones in terms of construction and includes an 84m tall bridge. This stretch of the highway will connect to the section between Skalite and the Polish border. The project is worth nearly €330 million.

Related Content

  • Czech tenders for D6 section near Karlovy Vary
    June 7, 2023
    The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
  • Czech transport connections
    April 28, 2020
    Czech transport connections will benefit from spending.
  • Delays for Czech highways
    May 30, 2012
    THE NEW highway network currently being built in the Czech Republic will be completed in 2025, five years later than the original planned completion date of 2020. The country’s Transport Ministry has said that €19.55 billion will be needed to extend the total length of the network from the current 1,113km to 2,153km. However,it has pointed out that a new system of funding will be required or there will be a shortfall to pay for the plans by 2020.Various options are being considered at present with bond issu
  • Poland calls a tender for work on the Biskupia Gorka viaduct
    May 25, 2017
    Poland will have to spend around €7.12 billion to complete its section of the trans-European Via Carpathia. Work on the north-south transport corridor could be completed by 2025, the government said during a recent European Economic Congress held in the Polish city of Katowice. The route is planned to run nearly 1,600km from the Lithuanian Baltic Sea port city of Klaipeda to the Greek city of Thessaloniki on the Aegean Sea. It passes through Poland, Slovakia, Hungary, Romania and Bulgaria. It will cross cor