Skip to main content

Slovakia highway section open to drivers

An important highway section in Slovakia is now open to drivers
By MJ Woof February 15, 2021 Read time: 1 min
A stretch of Slovakia’s D1 route is now open – image courtesy of © Sjankauskas, Dreamstime.com

A new 11km section of the D1 highway in Slovakia is now open to drivers. The stretch bypasses Zilina and connects Hricovske Podhradie with Lietavska Lucka. This section of the D1 includes the Zilina tunnel and the 2.5km Ovciarsko tunnel. The work cost €445.17 million and construction was carried out by a contracting consortium comprising Doprastav Metrostav, Strabag and Vahostav.

Construction of the tunnel sections posed challenges for the builders. 

The D1 forms part of the trans-European Network (TEN) and is Corridor 5, connecting Ukraine with the Venice, on the Mediterranean. The Slovakian section of the route connects Ukraine with Vienna and runs through Bratislava.

Related Content

  • Cost of D1 section Hubova-Ivachnova rises 40%
    August 3, 2023
    In Slovakia, the 15km Ružomberok bypass, including the 3.6km Čebrať Tunnel, is now €93 million more expensive than nine years ago.
  • Slovakia road tenders opening
    November 10, 2022
    Slovakian road tenders are opening for bids.
  • Slovakia highway construction deal signed
    April 12, 2017
    Plans are now going ahead in Slovakia for a key stretch of the D1 highway project. This 8km Presov West-Presov South section will cost €356 million to construct. The project will be carried out by the D1 Presov Consortium. The project partners in the consortium comprise Eurovia SK, Eurovia CS, Doprastav, Metrostav and Metrostav Slovakia. The agreement with the consortium was reached with Slovakia's National Highway Company (NDS), which awarded the package of works. Construction will commence in June 2017 an
  • Restart for Slovakia’s Čebrať tunnel and Hubova-to-Ivachnova D1 section
    December 13, 2017
    Work will restart on the 15.2km D1 bypass around the Slovakian town of Ružomberok after the government and contractors amended the contract. The consortium of OHL ZS and Vahostav-SK and the National Highway Company (NDS) recently signed and addendum to the contract that includes an extension of section’s Čebrať tunnel by1.6km to 3.6km and shortening of the road by around 300m. Because of continuing geological concern, NDS had earlier decided to reroute the road and the tunnel. As a result, the cost of the