Skip to main content

Singapore road tender opening

Singapore is opening the tender process for a major road project. The tender is for the construction and design of a section of the North South Corridor (Viaduct). This new link will connect Yishun Avenue 5 and SG Seletar. The tender process is being handled by Singapore’s Land Transport Authority. The closing date for the tender is 29th August, 2019. When fully complete in 2026, this highway will measure 21.5km in length.
June 10, 2019 Read time: 1 min

Singapore is opening the tender process for a major road project. The tender is for the construction and design of a section of the North South Corridor (Viaduct). This new link will connect Yishun Avenue 5 and SG Seletar. The tender process is being handled by Singapore’s Land Transport Authority. The closing date for the tender is 29th August, 2019. When fully complete in 2026, this highway will measure 21.5km in length.

Related Content

  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Colombian highway projects under development
    June 29, 2018
    A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Tender process underway for Polish road projects
    August 18, 2014
    The tender process is underway for two major projects in Poland. One project involves constructing three sections of the new southern ring road around Polish capital Warsaw. Building the 18.5km stretch that comprises the three sections is expected to cost in the region of €1.6 billion. The Polish General Directorate for National Roads and Motorways (GDDKiA) says that bids have to be submitted by 10th October 2014. The A section will be some 4.6km long, the B section 6.45km long, whilst the C section will be