Skip to main content

Serbia’s Zezelj bridge still to be repaired 15 years after NATO bombing

A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it.
May 2, 2014 Read time: 1 min
A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it. Dnevnik wrote that it is unclear when the bridge will be completed, mainly due to disputes between the main investor, the national railways company Zeleznice Srbije (ZS), and a company that has been awarded the rehabilitation project, the Spanish and Italian consortium of Azvi, Tadei, Horta and Koslada. Deadline for the completion of the bridge’s repairs ended last year.

Related Content

  • The need to repair and replace the world's bridges
    February 22, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector. All over the world existing highway bridges are in need of repair and replacement, with potentially catastrophic consequences should this need be ignored.
  • Plans for Romania’s new Danube Bridge project?
    May 5, 2017
    Romania’s Government is evaluating plans for a new bridge project, which would span the River Danube. The project has an estimated cost of nearly €440 million. The tender process is being opened by the Romanian National Agency for the Administration of Road Infrastructure (CNAIR). The bridge would be constructed in Romania’s Dobrogea Region. Funding looks likely to be provided, in part at least, by EU grants. As the Dobrogea Region is the location for the Danube Delta area where the river finally meets the
  • Italian JV wins Denmark’s Storstrom Bridge construction deal
    October 27, 2017
    An Italian joint venture has won the construction contract for Denmark’s replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate – Vejdirektoratet - awarded the work to contractors Itinera, Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €280 million for the 26m-wide single-support cable-stay structure. The European Union will subsidise the work to around €15 million.
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete