Skip to main content

Serbia completes Ostružnica Bridge

The 2km long bridge is the largest of all the Belgrade bypass bridges.
By David Arminas June 25, 2020 Read time: 1 min
The steel deck sections were built in a nearby shipyard (photo courtesy Serbian Ministry of Transport and Infrastructure)

Serbia has completed another bridge as part of a major bypass around the capital city Belgrade and which is part of the pan-European route E-75.

Zorana Mihajlovic, Serbia’s minister of transport and infrastructure, officially opened the remaining two lanes of the four-lane US$40.8 million Ostružnica Bridge over the Sava River, near the suburb of Ostružnica.

The 2km long bridge is the largest structure of all the bypass’s bridges and tunnels and is part of the 47.4km Dobanovci-to-Bubanj Potok section (officially section B).

The steel deck sections, some up to 80m long, were built in a nearby shipyard and barged to the site. The last steel deck section – 65m long and weighing around 400 tonnes - was pulled up into place from a barge on the river in December.

The 69km Belgrade bypass includes around 45km of the A1 motorway. Construction of the bypass started in 1990 with progressive openings of sections since then.

Related Content

  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Cleveland Bridge UK’s A14 work shortlisted
    July 15, 2020
    The showpiece bridge for A14 project is the 750m-long viaduct over River Great Ouse.
  • Major fleet
    February 6, 2012
    POLAND'S new A1 highway is the country's biggest road project at present and when complete, it will run 568km north to south from Gdansk to Gorzyczki, cutting the journey time from 10-6 hours. The project is a key one for Poland's economy and the highway will provide a vital new link for cross-country truck transport. This route forms part of the Trans-European Transport route connecting Norway with Greece, and work started in October 2005 on the first 100km phase, which was
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo