Skip to main content

Serbia completes Ostružnica Bridge

The 2km long bridge is the largest of all the Belgrade bypass bridges.
By David Arminas June 25, 2020 Read time: 1 min
The steel deck sections were built in a nearby shipyard (photo courtesy Serbian Ministry of Transport and Infrastructure)

Serbia has completed another bridge as part of a major bypass around the capital city Belgrade and which is part of the pan-European route E-75.

Zorana Mihajlovic, Serbia’s minister of transport and infrastructure, officially opened the remaining two lanes of the four-lane US$40.8 million Ostružnica Bridge over the Sava River, near the suburb of Ostružnica.

The 2km long bridge is the largest structure of all the bypass’s bridges and tunnels and is part of the 47.4km Dobanovci-to-Bubanj Potok section (officially section B).

The steel deck sections, some up to 80m long, were built in a nearby shipyard and barged to the site. The last steel deck section – 65m long and weighing around 400 tonnes - was pulled up into place from a barge on the river in December.

The 69km Belgrade bypass includes around 45km of the A1 motorway. Construction of the bypass started in 1990 with progressive openings of sections since then.

Related Content

  • British Columbia decides on Massey Tunnel
    August 20, 2021
    Canada’s Pacific coast province of British Columbia has announced the George Massey Tunnel replacement will be another tunnel and not a bridge as decided earlier.
  • Tunnel Boom in Central and Eastern Europe
    September 15, 2015
    Following the success of the 41st World Tunnel Congress held in Croatia last May, World Highways looks at two signi_ cant projects in Slovakia and Serbia – Adriana Potts reports Central and Eastern Europe is buzzing with a number of major projects being developed - including highways, bridges and tunnels – and with many more in the pipeline. The region is expected to be highly active with plans for developing infrastructure in the next two decades, according to Davorin Koli , president of the Croatian
  • I Lift NY crane places first girder on New York’s Tappan Zee Bridge
    June 25, 2015
    One of the world’s largest cranes has placed the first steel girder assembly for the approach span of the new NY Bridge, often called the Tappen Zee Bridge in New York. The barge-mounted I Lift NY super crane with its nearly 100m boom slowly picked up the 125m unit from its delivery barge and gently lowered it onto concrete pedestals in the Hudson River, near the Rockland County side of the bridge. The super crane will install even larger sections of the new bridge, some of which weigh around 907tonne
  • Doubts over a Helsingør-Helsingborg link
    April 14, 2021
    Danish minister questions feasibility of a road-rail tunnel between the Danish and Swedish cities.