Skip to main content

Sections nearly ready for Indonesia’s trans-Sumatra route

Key sections of Indonesia’s important trans-Sumatra highway project are nearly ready for traffic. A 350km stretch that will connect with the city of Palembang should be open shortly. Meanwhile construction of the 141km Bakauheni to Terbanggi Bedar stretch is now starting, with this work being carried out by contractor Hutama Karya. The plans for the 2,765km trans-Sumatra toll road project call for the route to be complete by 2024. This will connect Aceh at the northern end of Sumatra with Lampung on the so
March 19, 2019 Read time: 1 min

Key sections of Indonesia’s important trans-Sumatra highway project are nearly ready for traffic. A 350km stretch that will connect with the city of Palembang should be open shortly. Meanwhile construction of the 141km Bakauheni to Terbanggi Bedar stretch is now starting, with this work being carried out by contractor 5206 Hutama Karya.

The plans for the 2,765km trans-Sumatra toll road project call for the route to be complete by 2024. This will connect Aceh at the northern end of Sumatra with Lampung on the south east coast.

For more information on companies in this article

Related Content

  • Delay for key section of Algeria highway
    August 19, 2016
    Delays are afflicting the official opening of a stretch of the East-West highway in Algeria. This 84km section of the highway connects Dréan in the east of Algerian to the border with neighbouring Tunisia. A Japanese contractor was in charge of the project to construct the 400km eastern stretch of the East-West highway. However financial problems surrounding the need for additional work led to construction of the final stretch being curtailed. There is concern that should the work be left unfinished any lon
  • A key section of highway is now open in Romania
    July 26, 2012
    In Romania the northern section of the bypass around the city of Constanta is open to traffic. The bypass forms part of the Pan-European Road Corridor IV and work on this section was financed by the European Bank for reconstruction and Development (EBRD). The southern stretch of the 23km bypass was completed in 2011. Now it is complete, the bypass will carry heavy port traffic away from Constanta. It will also provide a free-flowing route for tourist traffic from Romanian capital Bucharest and the north of
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the
  • Oslo Fjord Link a priority for 2024
    October 20, 2023
    The new tunnel will run parallel with the existing 7.3km-long structure which connects Hurum and Frogn near the Norwegian capital Oslo.