Skip to main content

Scotland to trial an all-electric road gritter unit from Bucher

Transport for Scotland will be trialling an all-electric gritter unit from Swiss company Bucher Municipal along the Forth Bridges this winter. The Electra 100% Electric Gritter: SEIV 19 – 350 is a version of Bucher’s Phoenix Electra in which a 48V electrical system replaces the usual hydraulic systems. It is powered by a lithium battery and brushless motors with dedicated and integrated inverter. Bucher says that the set-up avoids power losses and allows independent and proportional energy absorptions and
November 15, 2019 Read time: 2 mins
Transport for Scotland will use the Electra 100% Electric Gritter SEIV 19 – 350 on the Forth Bridge this winter

Transport for Scotland will be trialling an all-electric gritter unit from Swiss company Bucher Municipal along the Forth Bridges this winter.

The 2732 Electra 100% Electric Gritter: SEIV 19 – 350 is a version of Bucher’s 5903 Phoenix Electra in which a 48V electrical system replaces the usual hydraulic systems. It is powered by a lithium battery and brushless motors with dedicated and integrated inverter. Bucher says that the set-up avoids power losses and allows independent and proportional energy absorptions and management for each motor.

Lithium technology also allows battery partial charge during the salt refilling operation, even if the battery is not flat.

The carrier vehicle needs no modification because the Phoenix Electra is not run off the truck’s power. It is a real plug-and-play that can be mounted on each truck having adequate load capacity, savings all costs related to the truck installation and equipment.

Transport for Scotland said it has 213 gritters at over 40 depots across the country. Specialist route-specific snow plans have been produced, in conjunction with road operators and Police Scotland, for the M8, M74, M77 and M80 motorways, following the significant snow events of recent years.

Salt barns are full and hold almost 550,000 tonnes, which is more salt than was used during the whole of last winter. A gritter tracker software solution will be running again, letting people see live movement of gritters on the trunk road network and a trail with an age range for where gritters have previously passed along trunk routes.

“We can’t prevent the weather, but we can make sure we’re as well prepared as possible,” said Michael Matheson, the Scottish government’s cabinet secretary for transport, infrastructure and connectivity.

For more information on companies in this article

Related Content

  • Record breaking ABM bridge beams installed near Raith, Scotland
    September 30, 2016
    One of the largest mobile cranes in the UK, a 1,500tonne capacity unit, recently positioned nine 90tonne 42m pre-stressed bridge beams by ABM Precast Solutions. The massive W-beams were hoisted into place at Junction 5, the Raith Interchange, on Scotland’s M74 motorway – part of the M8-M73-M74 motorway improvements project.
  • Ireland and Scotland link?
    March 1, 2018
    Politicians in Northern Ireland have again raised the prospect of bridge to link western Scotland the Irish island, according to media reports. The road and rail crossing as envisaged by the Democratic Union Party would cost close to €23 billion. It would run between the Irish town of Larne in County Antrim and the Dumfries and Galloway coastline in Scotland. The DUP said in its manifesto for the 2015 UK general election that there should be a feasibility study into building a bridge or tunnel.
  • Key route upgrades for Scotland
    July 19, 2012
    Major road projects in Scotland will improve the country’s transport connections. Plans are now in hand to fast-track the project to convert the A9 to dual carriageway status along its entire length. The road is a major transport artery to the north of Scotland, connecting the Central Belt in the south with the northern city of Inverness, providing the main gateway to the north of the country. The plans call for the upgrading of the A9 to dual carriageway status between Perth and Inverness. Work on the 5km
  • £185 million deal for A9 in Scotland
    August 9, 2024
    A £185 million deal has been awarded for the A9 in Scotland.