Skip to main content

Scotland to trial an all-electric road gritter unit from Bucher

Transport for Scotland will be trialling an all-electric gritter unit from Swiss company Bucher Municipal along the Forth Bridges this winter. The Electra 100% Electric Gritter: SEIV 19 – 350 is a version of Bucher’s Phoenix Electra in which a 48V electrical system replaces the usual hydraulic systems. It is powered by a lithium battery and brushless motors with dedicated and integrated inverter. Bucher says that the set-up avoids power losses and allows independent and proportional energy absorptions and
November 15, 2019 Read time: 2 mins
Transport for Scotland will use the Electra 100% Electric Gritter SEIV 19 – 350 on the Forth Bridge this winter

Transport for Scotland will be trialling an all-electric gritter unit from Swiss company Bucher Municipal along the Forth Bridges this winter.

The 2732 Electra 100% Electric Gritter: SEIV 19 – 350 is a version of Bucher’s 5903 Phoenix Electra in which a 48V electrical system replaces the usual hydraulic systems. It is powered by a lithium battery and brushless motors with dedicated and integrated inverter. Bucher says that the set-up avoids power losses and allows independent and proportional energy absorptions and management for each motor.

Lithium technology also allows battery partial charge during the salt refilling operation, even if the battery is not flat.

The carrier vehicle needs no modification because the Phoenix Electra is not run off the truck’s power. It is a real plug-and-play that can be mounted on each truck having adequate load capacity, savings all costs related to the truck installation and equipment.

Transport for Scotland said it has 213 gritters at over 40 depots across the country. Specialist route-specific snow plans have been produced, in conjunction with road operators and Police Scotland, for the M8, M74, M77 and M80 motorways, following the significant snow events of recent years.

Salt barns are full and hold almost 550,000 tonnes, which is more salt than was used during the whole of last winter. A gritter tracker software solution will be running again, letting people see live movement of gritters on the trunk road network and a trail with an age range for where gritters have previously passed along trunk routes.

“We can’t prevent the weather, but we can make sure we’re as well prepared as possible,” said Michael Matheson, the Scottish government’s cabinet secretary for transport, infrastructure and connectivity.

For more information on companies in this article

Related Content

  • Scottish Roads Partnership to complete Central Scotland motorway network
    August 30, 2013
    Scottish Roads Partnership (SRP) has been announced as preferred bidder for the design, construction, financing and operation of a major infrastructure project to complete the Central Scotland motorway network. The key project will complete the motorway network between Glasgow and Edinburgh by upgrading the A8 trunk road between Baillieston and Newhouse to full motorway standards. It also includes work to improve the Raith Interchange and widening key sections of the M8, M73 and M74. This involves constr
  • Kramer adds the 8155 loader to its premium lineup
    June 25, 2018
    Kramer’s latest premium all-wheel steer loader, the 8155, has powerful load-sensing hydraulics and a Deutz engine equipped with ecospeedPRO travel drive. With a bucket tipping load of 5,600kg, a stack payload of 3,900kg and an operating weight of 9,150kg, the 8155 model opens up a new size class in the Kramer wheeled loader product portfolio. As with all all-wheel, crab and front-axle steering are available as standard. “When we look at the wheeled loader market, we see that the performance class of the 1
  • Philipp Swarovski lays down the marker
    June 10, 2019
    Swarco’s chief operating officer Philipp Swarovski shares his thoughts on highway safety and infrastructure in an age of uncertain future needs. David Arminas reports It was in Austria in 1969 when Manfred Swarovski opened his first glass bead factory. Five years later, operations started in the US. As the years rolled by there followed acquisitions and expansion of manufacturing facilities as well as a shift into intelligent transportation systems globally. Fast forward to 2019 and the family compan
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v