Skip to main content

Russia's new road link

Plans are in hand in Russia for a new bridge spanning the Kuban River in Krasnodar. The 300m bridge will carry four lanes of traffic when it is complete over the Kuban River. The design work for the bridge is expected to be complete in spring 2013. The new bridge will help reduce congestion as the current Yablonovsky Bridge features just two lanes. It was designed to handle 6,000 vehicles/day but is instead carrying up to 30,000 vehicles/day.
April 20, 2012 Read time: 1 min
Plans are in hand in Russia for a new bridge spanning the Kuban River in Krasnodar. The 300m bridge will carry four lanes of traffic when it is complete over the Kuban River. The design work for the bridge is expected to be complete in spring 2013. The new bridge will help reduce congestion as the current Yablonovsky Bridge features just two lanes. It was designed to handle 6,000 vehicles/day but is instead carrying up to 30,000 vehicles/day.

Related Content

  • St Petersburg link may include tunnel
    September 28, 2017
    A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million.
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • Germany to cut red tape for bridge construction up to 2027
    October 5, 2017
    The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027. Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance. The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working