Skip to main content

Rosavtodor roadshow for highway bridge over Russia’s Lena River

Rosavtodor has held a roadshow for the construction and operation of a highway bridge over the Lena River near Yakutsk in eastern Russia. A public-private partnership project, a starting price for the bridge’s construction has been set at US$1.95 billion (RUB 64 billion). Investments will have at least 5% of the project funds. The bridge is to be engineered and built in six years. Private investors will maintain the bridge for eight years, receiving regular payments from the state amounting to $485.68 milli
August 20, 2013 Read time: 1 min
Rosavtodor has held a roadshow for the construction and operation of a highway bridge over the Lena River near Yakutsk in eastern Russia.

A public-private partnership project, a starting price for the bridge’s construction has been set at US$1.95 billion (RUB 64 billion). Investments will have at least 5% of the project funds. The bridge is to be engineered and built in six years. Private investors will maintain the bridge for eight years, receiving regular payments from the state amounting to $485.68 million (RUB 16bn).

Tender applications for the private partner position will be accepted until 30 August 2013. 3382 Transstroy, Mostovik, the managing construction company Most, 2450 Mostotrest, and 5872 Sibmost have all expressed interest in the project.

For more information on companies in this article

Related Content

  • New PPP bridge project planned for Eastern Russia
    August 21, 2013
    Plans are in hand for a new bridge to span the Lena River near Yakutsk in Russia. The project is expected to cost US$1.95 billion. The bridge will take six years to design and construct, with the project being handled under the PPP model. Private investors will maintain the bridge over an eight year period, with payments being made by the Russian State. A number of leading companies have expressed interest in the project so far including Transstroy, Mostovik, Most, Mostotrest, and Sibmost.
  • New bridge planned for Yakutsk in Siberia
    April 12, 2013
    A new 3km long bridge is planned for Yakutsk in Siberia. This bridge will cross the River Lena and is at present expected to cost some US$1.74 billion to construct. The tender process for the project was initially to be held until the end of 2013. The timing of the tender process for the two lane bridge will now be announced in due course. Design and construction is expected to take six years once the contract is signed. Drivers will not pay tolls to use the bridge and instead the investor will be paid fees
  • Russia to commission new Moscow-St Petersburg highway by 2020
    June 20, 2017
    Final delivery of the final stretch for Russia’s key highway project looks set to be delayed – Eugene Gerden writes. I now looks as if Russia’s most ambitious project in the field of road building in recent years, the building of a new high-speed road link between Moscow and St Petersburg, the country’s largest cities, will not be complete in time. The project was set up by the Russian government and several private investors. According to initial state plans, building of the new road should have been compl
  • Putin orders doubling road-building in Russia by 2022
    November 21, 2014
    Russia looks set to accelerate its road building programme – Eugene Gerden writes The volume of road building in Russia should be doubled by 2022, according to a recent order of Russia’s president Vladimir Putin. He said, “We need a real breakthrough in road building during the next several years. These volumes should be doubled during the coming decade.”