Skip to main content

Rosavtodor roadshow for highway bridge over Russia’s Lena River

Rosavtodor has held a roadshow for the construction and operation of a highway bridge over the Lena River near Yakutsk in eastern Russia. A public-private partnership project, a starting price for the bridge’s construction has been set at US$1.95 billion (RUB 64 billion). Investments will have at least 5% of the project funds. The bridge is to be engineered and built in six years. Private investors will maintain the bridge for eight years, receiving regular payments from the state amounting to $485.68 milli
August 20, 2013 Read time: 1 min
Rosavtodor has held a roadshow for the construction and operation of a highway bridge over the Lena River near Yakutsk in eastern Russia.

A public-private partnership project, a starting price for the bridge’s construction has been set at US$1.95 billion (RUB 64 billion). Investments will have at least 5% of the project funds. The bridge is to be engineered and built in six years. Private investors will maintain the bridge for eight years, receiving regular payments from the state amounting to $485.68 million (RUB 16bn).

Tender applications for the private partner position will be accepted until 30 August 2013. 3382 Transstroy, Mostovik, the managing construction company Most, 2450 Mostotrest, and 5872 Sibmost have all expressed interest in the project.

For more information on companies in this article

Related Content

  • Rotenberg’s Mostotrest to fight for $5 billion Russia’s road-building contract
    December 2, 2013
    Interest is strong in one of Russia’s premier projects for road infrastructure - Eugene Gerden reports The State Company Russian Highways (Avtodor) has officially announced a tender for the construction of the sixth - and longest - section of the Moscow - St Petersburg highway. Avtodor is Russia’s leading company in the field of development of national road infrastructure, while this is one of the largest and most controversial projects in Russian road building in recent years. The 6th section of the
  • Tender for section of Moscow-St Petersburg highway
    October 17, 2012
    The Moscow authorities are holding a tender for building a section of Moscow - St.Petersburg highway. The project includes construction of a North Literal Highway section with 15 viaducts. The maximum contract price has been set at US $ 953.12 million (RUB 29.70bn). The tender results will be announced on 30 October 2012. The works must be implemented within 24 months. Mostotrest and Transstroy can take part in the tender. Engeocom is not going to participate.
  • Russia’s US$28 billion road and bridge works
    November 29, 2013
    A series of major transport projects worth a combined value of over US$28 billion are set to significantly enhance connectivity between various parts of Russia. These include the Moscow-St Petersburg highway, work to the transport system in the Rostov region and two new bridges: one over the Belaya river in Ufa, the other over the Kama river in Izhevsk. The tender process for the $4.46 billion contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announc
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill