Skip to main content

Romanian contract for STRABAG

A new Romanian road contract has been won by STRABAG.
By MJ Woof June 9, 2020 Read time: 1 min
STRABAG will carry out work on a further stretch of Romania’s A3 highway project

The Austrian contractor STRABAG has been awarded the follow-up contract for the A3 highway in Romania. This 4.5km highway section runs between Ungheni and Târgu Mureș and the work will include building a spur route.

The value of the contract for the road stretch from Ungheni and Târgu Mureș is worth €40 million. The spur route included in the deal itself measures 4.7km and features two lanes in either direction. The work is planned to start in July 2020 and is expected to take 18 months to complete. The contract was awarded to STRABAG by CNAIR, the Romanian road company.

Construction of the Ungheni–Ogra section of the A3 highway was completed successfully in 2018. “A follow-up order is always a positive sign that our work has been valued by the client. After handing over the 10.1 km section between Ungheni and Ogra in 2018, we are happy to continue working on this central traffic artery,” said Thomas Birtel, CEO of STRABAG.

For more information on companies in this article

Related Content

  • Romania building new road and highway links
    July 19, 2016
    Romania’s road building programme is moving forward, but perhaps more slowly than the country’s National Company for Highways and Roads (CNADNR) would prefer. At present a total of 733km of highways are open to use in Romania, but new sections measuring up to 260km in all should be ready for traffic by the end of 2017. A further 22km of the A1 highway connecting Orastie with Sibiu is expected to open in the third quarter of 2016. The Deva to Lugoj stretch of the A1 has also to be completed, while a section
  • Consortium signs contract for section of S5 expressway in Poland
    August 8, 2014
    A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company Strabag) and Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.
  • Zimbabwe highway project linking with its neighbours
    November 28, 2016
    Zimbabwe’s Beitbridge to Chirundu highway link now looks set for a complete upgrade. The project has been planned for over 10 years but has faced a series of setbacks and delays, with funding having proved one of the biggest stumbling blocks in the past. The 897km highway runs from Beitbridge, located on the border with South Africa in the south of Zimbabwe all the way up to Chirundu, which is just over the border with Zambia in the north. The route includes part of the A4 highway in the south and the A1 hi
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru