Skip to main content

Prague wins legal battle over Blanka Tunnel costs

The Czech capital Prague will not have to pay €63 million to construction firm CKD Praha DIZ for cost overruns on the Blanka Tunnel complex. CKD Praha DIZ sought the amount over an alleged rise in costs when completion of the tunnel was delayed, according to a report by Radio Praha.
September 6, 2016 Read time: 2 mins

The Czech capital Prague will not have to pay €63 million to construction firm CKD Praha DIZ for cost overruns on the Blanka Tunnel complex.

CKD Praha DIZ sought the amount over an alleged rise in costs when completion of the tunnel was delayed, according to a report by Radio Praha.

A court of arbitration also ruled that the company must pay the city’s legal costs of around €630,000. The court’s decisions are binding and final.

The 6.4km Blanka Tunnel complex is a part of Prague’s unfinished ring road system and is the longest road tunnel in the Czech Republic and the longest city tunnel in Europe. Just under 40km of the 83km Ring Road are complete.

The tunnel, which connects the area west of Prague Castle with Trója district in the northeast, consists of three tunnels - Bubenečský, Dejvický and Brusnický. Construction started in 2006 and completion was supposed to be 2011.

However, delays put the opening date back to September last year and doubled the overall cost to around €1.6 billion.

A survey by Prague’s Technical Administration of Roadways recently found that on averages 75,000 vehicles use the Blanka tunnel daily.

Related Content

  • RADOR highlights claimed shortfall in North West Russia road funds
    February 13, 2013
    The RADOR association, the leading organisation for advocating, planning, financing, building and maintaining roads in Russia’s regions, estimates the country’s North-Western Federal District needs US$5.367 billion (RUB 161.8bn) for road network repair and maintenance every year. RADOR says that around 19.7% of required funding was provided for regional road maintenance in 2012, along with 41.4% of funding for road repairs, and 6.3% of funding for road overhaul. The Leningrad region received 25% (RUB 5.1bn)
  • Kapsch for Kekava Bypass
    March 6, 2024

    The Ķekava Bypass - Latvia's first "high-speed road" - opened in October and with it a traffic management system from Kapsch TrafficCom started operation.

    The bypass is providing an efficient alternative for motorists travelling between the Latvian capital Riga, on the Baltic Sea, and neighbouring Lithuania to the south. Traffic in the small town of Ķekava is now being reduced.

  • D11 motorway in Czech Republic could be completed after over 17 year land dispute
    March 6, 2013
    A land dispute that has stalled the completion of the D11 motorway in the Czech Republic for more than 17 years is reportedly nearing its end. The Czech road management firm RSD has applied for planning permission to build the D11 between Prague and Hradec Kralove omitting the disputed land. But it’s reported that the Transport Ministry is looking to come to an agreement with the owner of the last outstanding bit of land on the originally proposed D11 route, which will allow the preferred route to be comple
  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.