Skip to main content

Prague to renovate the old Liben Bridge

The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement. Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most . Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years. The Libeň Bri
May 7, 2019 Read time: 1 min
The Czech capital Prague has cancelled a contract worth almost US$90 million to demolish old the Liben Bridge and build a replacement.


Instead, it will spend nearly $22 million to renovate and strengthen the existing bridge - Libensky Most .

Media reported that the bridge will have its frame replaced and will be strengthened during the renovation, following recommendations from the Czech Technical University's Klokner Institute. Renovating the bridge will likely take around two years.

The Libeň Bridge, opened in 1928,  is 37m long - the longest bridge in Prague.  Its wide is 21 metres and the tram line is a part of the bridge since its opening.  It has five arches with the spans between 28 and 43m. It replaced a temporary wooden bridge which had been around since 1903.

The bridge was slightly damaged by a flood in 2002. In 2016, a study by the university stated that the bridge needed restoration.

Related Content

  • VIDEO: UK overnight bridge demolition job
    May 16, 2016
    A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.
  • Rader Hochbrücke construction set for summer
    April 7, 2025
    Work on the Rader Hochbrücke (bridge) near Rendsburg, Germany, will start this summer and take five years, according to DEGES.
  • Acrow lends critical support for the Cradock Bridge renovation
    October 28, 2016
    International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program. W
  • Czech tenders for D6 section near Karlovy Vary
    June 7, 2023
    The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.