Skip to main content

Polish tunnel project receiving bids

Bids are now being received for an important tunnel project in northern Poland. The country’s General Directorate for National Roads and Motorways (GDDKiA) has had four offers worth between €194 million and €259 million for the construction of the tunnel. The new link is planned to be built in Swinoujscie and will run under the Swina River to Uznam Island with Wolin Island.
September 15, 2017 Read time: 1 min

Bids are now being received for an important tunnel project in northern Poland. The country’s General Directorate for National Roads and Motorways (GDDKiA) has had four offers worth between €194 million and €259 million for the construction of the tunnel. The new link is planned to be built in Swinoujscie and will run under the Swina River to Uznam Island with Wolin Island. The tunnel is to be over 1.4km long and will be bored using a TBM with a diameter of 12m. Bids have been received from the Italian consortium formed by Toto Costruzioni Generali and ICM, a consortium comprising Astaldi and Ghella consortium, the Porr consortium and a consortium made up of China Harbour Engineering and Mosty Lodz.

Related Content

  • Tender process underway for Polish road projects
    August 18, 2014
    The tender process is underway for two major projects in Poland. One project involves constructing three sections of the new southern ring road around Polish capital Warsaw. Building the 18.5km stretch that comprises the three sections is expected to cost in the region of €1.6 billion. The Polish General Directorate for National Roads and Motorways (GDDKiA) says that bids have to be submitted by 10th October 2014. The A section will be some 4.6km long, the B section 6.45km long, whilst the C section will be
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.
  • TBM built in China for Indian project
    April 29, 2020
    A TBM built in China will be used for an Indian project.