Skip to main content

Polish island tunnel connection planned

The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans
February 7, 2017 Read time: 2 mins
The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans call for the construction of a 3.4km long tunnel that will feature a diameter of 12m and which will be excavated using a TBM. Firms invited to tender include a consortium comprising 3302 Budimex and 2717 Ferrovial, a consortium made up of 1324 Astaldi and Ghella, a consortium called 8002 Polaqua that includes 6423 Toto Costruzioni Generali and ICM and another consortium headed by Austrian contractor 945 Strabag. In addition, 980 OHL has also been invited to tender. Funding worth €179 million is being provided by the EU and will cover 85% of the costs associated with the project. The source for the remainder of the funding has yet to be announced.

Related Content

  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • Tunnel waterproofing solutions
    February 29, 2012
    Tunnels are the highest value assets on a highway, making their operation, safety and maintenance of paramount importance. Patrick Smith reports
  • STRABAG wins new Romanian dual carriageway deal
    July 27, 2021
    STRABAG has been awarded a major new Romanian dual carriageway deal.
  • Polish project tangle unravels?
    February 28, 2012
    The Polish General Directorate of National Roads and Motorways (GDDKiA) is not allowing Chinese firm COVEC to continue construction of A2 highway.