Skip to main content

Plans moving forward for key Turkish highway

Plans are moving forward in Turkey for the construction of a new highway project. Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
October 11, 2013 Read time: 2 mins
Istanbul is on record as one of the world's most traffic-congested cities
Plans are moving forward in Turkey for the construction of a new highway project. 2579 Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
 
The project involves the design, construction, maintenance and operation of the 60km dual four lane Northern Marmara highway between Odayeri and Paşaköy. It includes construction of 55km of connecting roads, 19 motorway junctions, 67 viaducts, and seven tunnels and a road/rail stay cable stiffened suspension bridge across the Bosphorus. The new bridge, designed by Michel Virlogeux and Swiss consultant T-Engineering, will be a combined road and rail suspension with a main span of 1.4km. It will be the first long span bridge to accommodate an eight lane highway and a two line railway on the same level, giving it a width of 59m. The structure will also have the world’s tallest towers, at over 320m.
 
Mott MacDonald will carry out a technical due diligence review of the project documentation produced by concession company ICA up to financial close. This will include a review of the transaction documents, design, construction methodology, operation and maintenance proposals, budget, programme, payment mechanism and risk analysis. Following financial close, Mott MacDonald will undertake construction and operations monitoring on behalf of lenders.
 
The new east-west route should alleviate congestion on existing routes across Istanbul, including the two existing bridges across the Bosphorus.

For more information on companies in this article

Related Content

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Turkey mega project opening for tender
    January 12, 2017
    The tender process is commencing for a US$5 billion contract to construct a bridge and a road network of roads in Turkey. The bridge will span the Dardanelles waterway and the project looks likely to attract strong interest from several major international construction firms. The Çanakkale 1915 Bridge will be located at the western end of the Sea of Marmara, a short distance from Çanakkale. The 3.6km long bridge will feature a main span of 2.023km, making it one of the longest suspension bridges in the worl
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Self-climbing formwork solution for bridge pylons
    February 27, 2012
    Harsco Infrastructure has provided self-climbing formwork (SCF), which is helping ensure quick and safe access during the construction of a 320m tall pylon for the world’s longest cable-stayed bridge.