Skip to main content

Plans in hand for new Slovakian tunnel construction

Work to complete the Kosice-Ruzomberok highway connection in Slovakia is now being planned. The remaining stretch still to be built is for the South-West Presov by-pass, with the most challenging section being the road tunnel at Presov, which will be 2km long. The construction work is commencing shortly and is expected to cost close to €370 million. The work is expected to take four years to complete. Slovakia’s national highway company NDS is at present evaluating which construction firm would be best plac
October 13, 2015 Read time: 1 min
Work to complete the Kosice-Ruzomberok highway connection in Slovakia is now being planned. The remaining stretch still to be built is for the South-West Presov by-pass, with the most challenging section being the road tunnel at Presov, which will be 2km long. The construction work is commencing shortly and is expected to cost close to €370 million. The work is expected to take four years to complete. Slovakia’s national highway company NDS is at present evaluating which construction firm would be best placed to carry out the project.

Related Content

  • Highway construction to be completed for South East Nigeria
    June 11, 2018
    Further financing will be required to complete construction work for Nigeria’s vital East-West highway project. Work is being carried out on sections of the highway between Warri and Port Harcourt and from Eket to Ikot Akan and Atan Ikpe. The former stretch is being handled by Setraco Nigeria, while the latter is being handled by Reynolds Construction Company. However a further US$277.4 million will be required to fund the work, which involves widening the highway so that it features two lanes in either dir
  • Australia road upgrades planned
    April 12, 2022
    Australian road upgrades are being planned.
  • STRABAG wins tricky Polish project
    May 2, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • South German road tunnel project to restart
    July 26, 2018
    Construction work on the Kramertunnel in South Germany is to restart. The tunnel is needed to help reduce traffic delays in the town of Garmisch-Partenkirchen in the southern German state of Bavaria and with lies next to the border with Austria. The twin tube tunnel stretches will both be around 2.8km long and the project will also include building six bridges as part of the new bypass around the town. The new bypass, with its tunnel and bridges, is required as traffic jams occur regularly in the town on th