Skip to main content

Parsons wins US-Canada bridge contract

Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada.
October 7, 2016 Read time: 1 min
RSS

3220 Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada. This twin-span international bridge links Canada and the United States and is the second busiest crossing between the two countries.

The three-year contract covers structural engineering, inspection, structural design, emergency repair consultation, general studies and reports, and as-needed engineering services for the Blue Water Bridge, approach bridges, and mechanically stabilised earth (MSE) walls.

For more information on companies in this article

Related Content

  • US city of Vancouver approves new I-5 bridge
    July 18, 2022
    Vancouver in the US state of Washington and Portland in the state of Oregon are aiming for a new road bridge with the possibility of accommodating light rail transport.
  • New bridge for Ob River in Yamalo-Nenets Autonomous Area
    June 2, 2014
    Plans are in hand for a new bridge spanning the Ob River in the Yamalo-Nenets Autonomous Area. This area forms part of the Russian Federation within the Tyumen Region, and is a part of Ural Federal District. At this stage the project looks likely to be carried out under the PPP model, with construction due to be complete by 2017.
  • Flyover and tunnel planned for D3 route in Slovakia
    February 13, 2015
    In Slovakia plans are in hand for work to the D3 route that will involve the construction of a flyover, a bridge and a tunnel. The flyover lies on the stretch of D3 between Zilina/Strazov and Zilina/Brodno. Work on this 4.25km section of the D3 is costing close to €255 million. The construction work commenced in June 2014 and is due for completion by 2017. The work is complex and includes building flyover over the Hricovska Prehrada Dam, as well as driving a tunnel and constructing bridge over the Kysuca Ri
  • HDR’s twin Rockingham bridges win PCI award
    February 12, 2021
    The award from the Precast Concrete Institute is a third win for HDR projects.