Skip to main content

Parsons wins US-Canada bridge contract

Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada.
October 7, 2016 Read time: 1 min
RSS

3220 Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada. This twin-span international bridge links Canada and the United States and is the second busiest crossing between the two countries.

The three-year contract covers structural engineering, inspection, structural design, emergency repair consultation, general studies and reports, and as-needed engineering services for the Blue Water Bridge, approach bridges, and mechanically stabilised earth (MSE) walls.

For more information on companies in this article

Related Content

  • A new study is being carried out for a proposed bridge project for the UK’s Thames River
    April 4, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Efkon India wins four tolling and ITS contracts
    April 30, 2012
    Austria-headquartered Efkon Group has announced that its Efkon India subsidiary has received four prestigious tolling and ITS contracts valued at some US$8.8 million in total. The company has received a repeat contract from Oriental Structural Engineers to provide the complete ITS product-mix for the Nagpur Bypass project. This contract includes the delivery of advanced traffic management systems (ATMS) for 117 kms and 44 lanes of semi-automatic toll system integrated with a weigh-in-motion (WIM) system. Ef
  • ARTBA highlights US bridge issues
    May 10, 2016
    The American Road & Transportation Builders Association (ARTBA) is calling for more bridge repairs in the US. There are still too many structurally deficient bridges in the country according to a recent analysis. This report states that while there were 2,574 fewer structurally deficient bridges in 2015 compared to the number in 2014, there are still 58,500 on the structurally deficient list. Worse still, at the current pace of bridge investment it will take at least 21 years before these bridges are all r
  • Hong Kong bypass contract approved
    May 3, 2012
    A US$4 billion bypass contract has been signed in Hong Kong. The deal for the Central-Wan Chai Bypass project has been agreed by the Hong Kong Highways Department with the joint venture Chun Wo-CRGL-MBEC.