Skip to main content

Parsons wins US-Canada bridge contract

Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada.
October 7, 2016 Read time: 1 min
RSS

3220 Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada. This twin-span international bridge links Canada and the United States and is the second busiest crossing between the two countries.

The three-year contract covers structural engineering, inspection, structural design, emergency repair consultation, general studies and reports, and as-needed engineering services for the Blue Water Bridge, approach bridges, and mechanically stabilised earth (MSE) walls.

For more information on companies in this article

Related Content

  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Two bridges in Nepal to help power generation increase
    October 11, 2012
    Construction of two vital bridges in Nepal will help increase power generation and offer a return on investment Two bridges are required in Nepal to enable the country to address its current capacity shortfall in electric power generation. Once constructed, they will be the largest single-span truss bridges in Nepal. Construction of the Arun River Bridge at Leguwaghat, Dhankuta, and Sabha Khola Bridge, Sankhuwasabha District, is also required to maximise the rate of return on special programmes under the R
  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight