Skip to main content

Parsons wins bridge deal in Arkansas

Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation
January 17, 2017 Read time: 2 mins
3220 Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction.  The new bridge will be constructed some 61m upstream from the existing structure.  

The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation vessels. The new bridge will have 18 spans comprising six lanes and will provide 98m of horizontal clearance between the two main river piers and 15.8m of clearance above the White River. It will feature drilled shaft foundations instead of pile foundations as this will reduce costs as well as the time needed for construction. In addition, construction of the new link will include demolition of the old bridge, earthwork, traffic maintenance, and erosion control.

I-40 is an east-west interstate highway connecting Oklahoma and Tennessee with the majority of the route in Arkansas. Construction of the new White River Bridge and its approach roads is scheduled to begin in March 2017 and is expected to be complete in summer 2019. Once the new bridge is in operation its additional lanes will boost capacity will help improve journey times as well as safety for drivers in the area.

For more information on companies in this article

Related Content

  • “Structurally deficient” US bridges need warning signs, says ARTBA
    April 10, 2015
    A US construction sector group wants warning signs to be posted on bridges designated “structurally deficient" and in need of repair by state engineers. More than 61,000 structurally deficient bridges remain in need of significant repair, according to the American Road & Transportation Builders Association (ARTBA), which analysed the US Department of Transport’s National Bridge Inventory database. However, by the end of 2014 there were more than 2,000 fewer structurally deficient structures than in 20
  • US$73 million Francis Scott Bridge replacement contract
    September 3, 2024
    Kiewit has been awarded a US$73 million Francis Scott Bridge replacement contract.
  • M7 expansion on schedule in Hungary
    May 27, 2025
    Project is part of biggest express road upgrade in country's history
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin