Skip to main content

Parsons wins bridge deal in Arkansas

Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation
January 17, 2017 Read time: 2 mins
3220 Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction.  The new bridge will be constructed some 61m upstream from the existing structure.  

The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation vessels. The new bridge will have 18 spans comprising six lanes and will provide 98m of horizontal clearance between the two main river piers and 15.8m of clearance above the White River. It will feature drilled shaft foundations instead of pile foundations as this will reduce costs as well as the time needed for construction. In addition, construction of the new link will include demolition of the old bridge, earthwork, traffic maintenance, and erosion control.

I-40 is an east-west interstate highway connecting Oklahoma and Tennessee with the majority of the route in Arkansas. Construction of the new White River Bridge and its approach roads is scheduled to begin in March 2017 and is expected to be complete in summer 2019. Once the new bridge is in operation its additional lanes will boost capacity will help improve journey times as well as safety for drivers in the area.

For more information on companies in this article

Related Content

  • Key Botswana road network gets an upgrade
    June 30, 2014
    Representing an investment of around US$113 million, Botswana’s A1 national road between Tonota and Francistown is undergoing a major upgrade This single-lane section is being progressively transformed into a north- and southbound dual carriageway, crossing four existing river bridges along the way. A strategically important transportation route for both Botswana and the southern African region, the A1 passes through Francistown, the nation’s second largest city, heading northwards to end at the Zimbabwe b
  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • More on the Newmarket Viaduct replacement
    June 15, 2012
    When it was completed in 1965 – just six years after the Auckland Harbour Bridge – the six-lane Newmarket Viaduct with its tall, slender piers was something of an engineering wonder, the first of its kind in the Southern Hemisphere. Forty years on it had become a much-maligned contributor to Auckland’s chronic traffic congestion, too weak seismically to withstand the heaviest loaded trucks let alone a severe earthquake, so narrow in the shoulders that any accident stopped traffic flow and made it difficult
  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.