Skip to main content

Parsons wins award for Caldecott Tunnel

Parsons has won an award for its work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway proje
November 8, 2013 Read time: 2 mins
3220 Parsons has won an award for ITS work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway projects. The tunnel was excavated using sequential excavation, also known as the New Austrian Tunneling Method.

The Caldecott Fourth Bore Project represents a partnership between the 2410 Federal Highway Administration, the 2451 California Department of Transportation, the 7419 Metropolitan Transportation Commission, the Contra Costa Transportation Authority, and the Alameda County Transportation Commission. When it opens to traffic in late 2013, the Fourth Bore will relieve traffic congestion in the off-peak direction along a heavily traveled section of State Route 24 by permanently dedicating two bores to westbound traffic and two bores to eastbound traffic.  This multimillion-dollar project is one of the largest recipients of 1088 American Recovery and Reinvestment Act funding in the nation, a testament to ITS regional importance.

Related Content

  • Concern over the state of US bridges
    April 1, 2019
    Bridge condition is a serious concern in the US, according to a new report from American Road & Transportation Builders Association (ARTBA).
  • US DOTs in critical funding battle
    February 9, 2012
    In the US, state DOTs are preparing for the upcoming reauthorisation battle in a tough economic and political climate. Set to expire by the end of the year, the bill is a critical funding source for many transportation projects in the US. However transportation officials in the US are facing a tough battle as the political and economic climate has changed considerably since the last reauthorisation was passed, shortly after President Obama's inauguration in January 2009. Since then, the recession has contin
  • Parsons selected for transport awards in California
    June 15, 2016
    The California Transportation Foundation (CTF) has selected two projects carried out by Parsons for the 27th Annual CTF Transportation Awards. These are the I-15 Integrated Corridor Management System (ICMS) for Operational Efficiency Program of the Year and the Foothill Gold Line extension for Transit/Rail Project of the Year. As the I 15 ICMS integrator, Parsons installed its cutting edge Intelligent NETworks product to help connect multimodal and multiagency transportation systems along a 32km section
  • Australian mega link route opens
    November 29, 2012
    Australia’s largest and most complex transport infrastructure project in the city of Brisbane has been officially opened to traffic. The first vehicles have now used the Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade projects, which together form an extensive US$5.85 billion transport project. The project in Australia’s third most populous city in the state of Queensland comprises a toll road and dedicated busway route, together involving almost 12km of tunnels (described