Skip to main content

Parsons wins award for Caldecott Tunnel

Parsons has won an award for its work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway proje
November 8, 2013 Read time: 2 mins
3220 Parsons has won an award for ITS work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway projects. The tunnel was excavated using sequential excavation, also known as the New Austrian Tunneling Method.

The Caldecott Fourth Bore Project represents a partnership between the 2410 Federal Highway Administration, the 2451 California Department of Transportation, the 7419 Metropolitan Transportation Commission, the Contra Costa Transportation Authority, and the Alameda County Transportation Commission. When it opens to traffic in late 2013, the Fourth Bore will relieve traffic congestion in the off-peak direction along a heavily traveled section of State Route 24 by permanently dedicating two bores to westbound traffic and two bores to eastbound traffic.  This multimillion-dollar project is one of the largest recipients of 1088 American Recovery and Reinvestment Act funding in the nation, a testament to ITS regional importance.

Related Content

  • Certified safe: ARTBA president talks future highways and safety
    January 16, 2020
    What keeps Dave Bauer* up at night? David Arminas caught up with the head of ARTBA at his Washington D.C. office during daylight hours
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Delcan wins IRF Global Road Achievement Awards
    March 2, 2012
    The International Road Federation (IRF) has awarded Delcan two Global Road Achievement Awards (GRAA) at their annual banquet in Washington, DC, for Quality Management and also for ITS.
  • Bertha readies for more Seattle SR99 Alaskan Way Viaduct tunnel work
    July 27, 2015
    Bertha, one of the world’s largest tunnelling machines will resume work underneath the US city of Seattle in November, nearly two years after breaking down. Bertha, at 17.4m diameter, began her journey in July 2013. She was boring a path to relocate a 3.2km stretch of the elevated State Route 99 Alaskan Way Viaduct, built between 1949 and 1953 and which carries around 100,000 vehicles daily. The elevated section will be moved underground allowing the creation of public space along Seattle’s downtown w