Skip to main content

Oman deal for Turkish/Italian partners

The first phase of Oman's new Sur road project is now being carried out by a joint venture comprising Turkish contractor Ozkar Insaat (Ozkar) and Italian firm Astaldi.
February 9, 2012 Read time: 1 min
The first phase of Oman's new Sur road project is now being carried out by a joint venture comprising Turkish contractor 1325 Ozkar Insaat (Ozkar) and Italian firm 1324 Astaldi. The US$325.5 million deal is for a 40km section of the Bidbid-Sur road. The joint venture partners will widen the single-lane road into a two-lane all-weather link. Other parts of the work include building small bridges and culverts along with five wadi-crossing bridges spanning 350m and 400m as well as elevations from 40-80m. The stretch is situated between Sarur in Samayil and Wadi Al Aqq. The winning bid for the second phase of this road project is due to be announced shortly. Turkish contractors are increasingly keen to work on projects outside of their home country and have recently won several deals in The Middle East.

For more information on companies in this article

Related Content

  • Turkish win for Romanian Sibiu-Pitesti section
    March 10, 2022
    Mapa Insaat and Cengiz Insaat Sanayi will build the the 31km between Boita and Cornetu.
  • New Oman highway road project
    August 18, 2014
    In Oman plans are in hand for a major road widening project. The project calls for the widening of the 715km Adam-Thumrait highway. Local contractor, Ghantoot Transport and General Contracting Establishment (GTGC) made an offer of US$285.7 million for phase one of the project. GTGC also offered $229.9 million for the second phase of the project. Other contractors have submitted bids including Galfar Engineering and Contracting, Strabag Oman, Ozkar Construction Co, Consolidated Contractors Co, Dogus Construc
  • Prequalification tender for Oman carriageway project floated
    June 13, 2013
    The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
  • A new Norwegian bridge project
    June 15, 2020
    A new Norwegian bridge project will be built.