Skip to main content

New Oman highway road project

In Oman plans are in hand for a major road widening project. The project calls for the widening of the 715km Adam-Thumrait highway. Local contractor, Ghantoot Transport and General Contracting Establishment (GTGC) made an offer of US$285.7 million for phase one of the project. GTGC also offered $229.9 million for the second phase of the project. Other contractors have submitted bids including Galfar Engineering and Contracting, Strabag Oman, Ozkar Construction Co, Consolidated Contractors Co, Dogus Construc
August 18, 2014 Read time: 1 min

In Oman plans are in hand for a major road widening project. The project calls for the widening of the 715km Adam-Thumrait highway. Local contractor, 2379 Ghantoot Transport and General Contracting Establishment (GTGC) made an offer of US$285.7 million for phase one of the project. GTGC also offered $229.9 million for the second phase of the project. Other contractors have submitted bids including Galfar Engineering and Contracting, 945 Strabag Oman, Ozkar Construction Co, Consolidated Contractors Co, Dogus Construction Oman and Khalid Bin Ahmed & Sons. The project will see the road being widened to a four lane dual carriageway along its length.

For more information on companies in this article

Related Content

  • Oman’s major road project awarded
    December 4, 2012
    Oman's Directorate General of Roads and Land Transport has awarded US engineering and construction firm Parsons a contract to provide design and construction supervision services for the expansion of the Nizwa-Thumrait road. Under the deal, Parsons is required to provide preliminary and detailed design as well as providing tender documents, construction supervision, traffic study and analysis along with alignment study and finalisation. The project includes the conversion of a single 715km carriageway betwe
  • Prequalification tender for Oman carriageway project floated
    June 13, 2013
    The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
  • Contract for Oman’s key road development
    July 16, 2020
    A new contract has been awarded for Oman’s key road development.
  • Oman’s new US$390 million highway
    December 5, 2024
    Oman is building a new US$390 million highway.