Skip to main content

Odebrecht may exit Peru contracts

Brazilian contractor Odebrecht may withdraw from its current contracts in Peru. The firm had planned to continue operating in Peru but is now considering withdrawing. Odebrecht has hit a series of troubles in Peru due to the complex political situation as well as allegations over improper business practices. The firm is looking to sell off the contracts that it holds in Peru at present and has already dispensed with some operations in the country.
March 9, 2017 Read time: 1 min
Brazilian contractor 1305 Odebrecht may withdraw from its current contracts in Peru. The firm had planned to continue operating in Peru but is now considering withdrawing. Odebrecht has hit a series of troubles in Peru due to the complex political situation as well as allegations over improper business practices. The firm is looking to sell off the contracts that it holds in Peru at present and has already dispensed with some operations in the country.

For more information on companies in this article

Related Content

  • Chinese firm Shantui is developing a long term business strategy for growth
    November 13, 2014
    Chinese manufacturer Shantui is expanding its operations with a more diverse range of products – Mike Woof reports Chinese manufacturer Shantui is reorganising its operations to cope with the current tough market conditions, taking a long term view that is geared for future growth. The firm has expanded its operations significantly, broadening its product line away from its reliance on the bulldozer business where it has its origins. Demand for concrete equipment has been strong in China and the firm saw t
  • Chinese firm Shantui is developing a long term business strategy for growth
    January 6, 2017
    Chinese manufacturer Shantui is expanding its operations with a more diverse range of products – Mike Woof reports Chinese manufacturer Shantui is reorganising its operations to cope with the current tough market conditions, taking a long term view that is geared for future growth. The firm has expanded its operations significantly, broadening its product line away from its reliance on the bulldozer business where it has its origins. Demand for concrete equipment has been strong in China and the firm saw t
  • Chile’s Chacao Bridge project - futuresecured
    July 19, 2018
    Chile’s landmark Chacao Bridge project now looks to be back on a sound footing, with completion expected in late 2022 or early 2023. This projects for the 2.6km-long bridge was to have been built jointly by Brazilian firm OAS and South Korean company Hyundai. However OAS hit financial difficulties and had to withdraw from the project. As a result, Hyundai will now buy the 49% stake OAS had in the project. As Hyundai already has a 51% stake in the bridge project, this will give the firm total ownership ove
  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.