Skip to main content

Nicaragua contract for FCC

Spanish contractor FCC has been awarded a contract to carry out key road upgrade works in Nicaragua. The €32 million project will see improvements being carried out on the 39km route connecting Los Chinamos with El Ayote.
December 14, 2017 Read time: 1 min
FCC will carry out road upgrades in Nicaragua

Spanish contractor 4914 FCC has been awarded a contract to carry out key road upgrade works in Nicaragua. The €32 million project will see improvements being carried out on the 39km route connecting Los Chinamos with El Ayote. The project will be carried out in two separate stages and will take 23 months to complete. The first section measures 19.6km long and runs from El Camastro to Los Chinamos. The second stretch is of a similar length and is from Los Chinamos to El Ayote. The client for the project is the Nicaraguan Ministry of Transport and Infrastructure (MTI). Work being carried out includes improvements to the alignment and drainage, as well as upgrades to bridges. The work is expected to improve transport in the area, improving safety for drivers while also reducing journey times.

For more information on companies in this article

Related Content

  • Shortlist set for Lower Thames tunnel work
    April 9, 2021
    Bam Nuttal, Bouygues, Dragados and Hochtief are in the running for the UK project.
  • The MBT-1 from Mobile Barriers now protecting workers in the UK
    August 14, 2019
    Two giant US-made 21m-long mobile barriers are now keeping highway maintenance workers safe in England.
  • Mota-Engil wins Cardel-Poza Rica motorway contract in Mexico
    June 13, 2014
    Mexico's Secretarat of Communications of Transport (SCT) has awarded the contract to build the Cardel-Poza Rica motorway to Portuguese company Mota-Engil. The proposal made by the company, together with PRODI, of US$266.48 million (MXN 3.47 billion), was deemed the most feasible technically and financially. The offer was below the $307.53 million (MXN 4 billion) estimated for the project in the National Infrastructure Plan (PNI). The road will be located in Veracruz, spanning 129km between Laguna Verde and
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of