Skip to main content

Mota-Engil wins Cardel-Poza Rica motorway contract in Mexico

Mexico's Secretarat of Communications of Transport (SCT) has awarded the contract to build the Cardel-Poza Rica motorway to Portuguese company Mota-Engil. The proposal made by the company, together with PRODI, of US$266.48 million (MXN 3.47 billion), was deemed the most feasible technically and financially. The offer was below the $307.53 million (MXN 4 billion) estimated for the project in the National Infrastructure Plan (PNI). The road will be located in Veracruz, spanning 129km between Laguna Verde and
June 13, 2014 Read time: 2 mins
Mexico's Secretarat of Communications of Transport (3067 SCT) has awarded the contract to build the Cardel-Poza Rica motorway to Portuguese company Mota-Engil. The proposal made by the company, together with PRODI, of US$266.48 million (MXN 3.47 billion), was deemed the most feasible technically and financially. The offer was below the $307.53 million (MXN 4 billion) estimated for the project in the National Infrastructure Plan (PNI). The road will be located in Veracruz, spanning 129km between Laguna Verde and Gutierrez Zamora. More than 3,200 vehicles are expected to travel on it each day. Empresas ICA was another firm bidding for the 30-year concession, but its $428.24 million (MXN 5.57 billion) offer was rejected.

The Cardel-Poza Rica road is the third concession awarded by the current administration after Atizapan-Atlacomulco and Siglo XXI, with the Ciudas Obregon bypass and Tuxpan-Tampico motorway currently being tendered.

Elsewhere in Mexico, the port authority (API) of the Mexican state of Tamaulipas has announced an investment of $115.32 million (MXN 1.5 billion) in port and road infrastructure. The funds will be used to complete works at the port of Matamoros by August 2015.

Matamoros port seeks to become consolidated to assist in industrial and commercial operations in Coahuila, Tamaulipas and Nuevo Leon. It will also feature a port terminal for state-run oil firm Petroleos Mexicanos (Pemex). So far, some 27km of the port access road have been built and workers are in the process of constructing another 17km. The port will have a navigation channel 3,700m long and 80m wide as well as 1,109 hectares of port area. The northern pier will be 1,456m long, while the southern pier will stretch across 1,623m.

For more information on companies in this article

Related Content

  • Mexican state of Guanajuato to invest US$287.74mn in roads
    May 28, 2014
    The Mexican state of Guanajuato is to invest US$287.74 million (MXN 3.7 billion) in roads infrastructure projects. Announcing the investment, Guanajuato state governor Miguel Marquez Marquez said the funds would cover over 300 construction, refurbishment, connectivity and modernisation projects. It is part of Marquez's so-called ‘Impulso’ programme which covers several areas of his administration, such as economic development, infrastructure and social programmes. Meanwhile, elsewhere in Mexico, it has em
  • Contractor consortium wins concession for Mexican highway
    June 12, 2014
    Contractor Mota-Engil is heading the consortium that has been awarded the Cardel-Poza Rica highway concession in Mexico. The package was awarded by Mexico's transport and communications ministry (SCT), reports Business News Americas. The Mota-Engil bid included work costs of US$269 million. The 30-year concession covers construction and operation of a 129km stretch of highway between Laguna Verde and Gutiérrez Zamora, improving connections in the coastal region of Veracruz state as well as connections to V
  • Mexico’s new highway link
    May 18, 2018
    The first section of the Cardel-Poza Rica highway has now been opened to traffic. The highway is in Mexico’s Veracruz State and the 30-year concession is being handled jointly by Mota-Engil and PRODI, which was awarded the tender by Mexico’s Secretariat of Communications and Transport (SCT) in mid-2014 with a bid of US$266.5 million. This first stretch of the highway that is now in use is the 55km section that runs from Nautla to Gutierrez Zamora. This stretch features 11 bridges, 11 underpasses and five
  • Foundations for Mexico highway with help from Liebherr
    November 9, 2017
    A Liebherr rotary drill rig and oscillator combination has been working in Mexico on a highway project for contractor Mota-Engil. A Liebherr piling rig is playing an important role on a major Mexican highway construction project being carried out by a division of the Portuguese firm Mota-Engil. The use of the rig by Mota-Engil Mexico’s newly formed geotechnical division is helping to set new quality standards for piling in the country. The contractor is leasing one of the latest Liebherr LB 24-270 rotary