Skip to main content

New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.
September 7, 2018 Read time: 2 mins
© Ivan Ramovic – dreamstime: Brotherhood and Unity Bridge - also known as Zezelj’s Bridge - straddles the Danube River in Novi Sad, Serbia

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open.

The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj.

The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei  and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high. It has two rail tracks and two vehicle lanes.

It was destroyed during the 1999  bombing of Yugoslavia, of which Serbia was a part, by NATO – North Atlantic Treaty Organisation – forces.

NATO bombing also destroyed the Varadin Bridge and Liberty Bridge.
Serbian president Aleksandar Vucic and European Union commissioner for enlargement negotiations Johannes Hahn attended the opening ceremony for the new bridge. Serbia is a candidate for membership of the EU.

Hahn said the €54 million new bridge - 474m long and 31.45m wide - is a symbol of Serbia’s European integration and the country’s efforts to build bridges “between citizens, people, the past and the future.” One of the pillars from the old bridge, that was 377m long, is supporting part of the new structure was reused to support the new steel structure.

The EU allocated €25 million, Serbia’s province of Vojvodina and the city of Novi Sad allocated €25 million, while the state allocated the remaining €4 million.

The new bridge is part of the European railway Corridor 10 and will carry the future Belgrade-Budapest high-speed railway.

Related Content

  • Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway
    October 20, 2017
    Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
  • Storstrom Bridge to be Denmark’s third longest
    March 8, 2018
    Form and functionality come together in Denmark’s latest Storstrom Bridge design. David Arminas reports. An Italian joint venture recently won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate - Vejdirektoratet - awarded the work to a joint venture of Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 milli
  • Strabag wins Polish road contracts worth €170 million
    November 2, 2017
    European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.
  • Serbia's key link
    February 27, 2012
    The southern section of Serbia's Corridor 10 highway is now carrying traffic, with only final works needed to complete the link.