Skip to main content

New Zealand highway project going ahead

Work is now going ahead on the new highway stretch to connect Peka Peka with Otaki, which will form part of the planned Kapiti Expressway. This 13km stretch of highway is being built by contractor Fletcher Construction. The package of works was awarded by the New Zealand Transport Agency (NZTA) and involves designing and building the new link. Construction work will start in 2017 and is expected to take until 2020.
December 2, 2016 Read time: 1 min
Work is now going ahead on the new highway stretch to connect Peka Peka with Otaki, which will form part of the planned Kapiti Expressway. This 13km stretch of highway is being built by contractor 2675 Fletcher Construction. The package of works was awarded by the New Zealand Transport Agency (NZTA) and involves designing and building the new link. Construction work will start in 2017 and is expected to take until 2020.

For more information on companies in this article

Related Content

  • Costs have climbed for a New Zealand project
    August 13, 2021
    The costs have climbed again for a key New Zealand road project.
  • Building New zealand's landmark tunnel
    February 15, 2012
    A landmark tunnelling project is commencing in New Zealand - Kristina Smith reports. New Zealand is preparing to embark on its biggest transport project ever. In August it announced that it had selected its preferred bidder for the NZ$1.4 billion Waterview Connection in Auckland, 5km of new motorway connecting highways to the North and South of the city.
  • New Zealand highway project on track
    November 15, 2018
    Progress is being seen in New Zealand for the US$456.5 million (NZ$709 million) project to construct a highway connecting Puhoi with Warkworth. The new route will feature dual lanes in either direction and should be ready for traffic towards the end of 2021. Vehicle numbers are increasing in New Zealand and by 2026, the route is expected to carry 35,000 vehicles/day. The project includes extending the Northern Motorway and linking it to the SH1 routes, which involves removing 4 million m3 of spoil.
  • Key New Zealand highway upgrade, budget set
    April 20, 2017
    Work on New Zealand’s State Highway 3 will see upgrades to improve capacity and s well as safety. The country’s Ministry of Transport has unveiled a government plan to spend US$94.46 million (NZ$135 million) on the project. The upgrades for State Highway 3 form part of New Zealand’s Accelerated Regional Roading Programme. Meanwhile further planning work has been required to the Mount Messenger bypass before a preferred option for the project can be confirmed. The New Zealand Transport Agency (NZTA) is curre